Study and test of the rebuncher for SARAF-LINAC phase II - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue Nucl.Instrum.Meth.A Année : 2021

Study and test of the rebuncher for SARAF-LINAC phase II

Leo Weissman
  • Fonction : Auteur
Boaz Kaizer
  • Fonction : Auteur
Eli Farber
  • Fonction : Auteur

Résumé

In order to match the beam exiting the RFQ to the superconducting cavities and to minimize the longitudinal beam extension, three rebunchers will be installed in the Medium Energy Beam Transport (MEBT) of SARAF-LINAC phase II. CEA is in charge of the design and fabrication of the copper-plated stainless steel, 3-gap rebunchers. Beam dynamic simulation leads to the global MEBT design. The rebuncher was successfully conditioned to the RF power of 4.4 kW required for CW operation, with sufficient power margin. A solid state power amplifier of 10 kW developed by SNRC is used during the RF test. The rebuncher shows a good performance in terms of the dissipated power, peak temperatures and vacuum level.
Fichier principal
Vignette du fichier
S016890022031113X.pdf (6.22 Mo) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)

Dates et versions

hal-02987508 , version 1 (24-10-2022)

Licence

Paternité - Pas d'utilisation commerciale

Identifiants

Citer

Lu Zhao, Xiaowen Zhu, Jonathan Dumas, Didier Chirpaz, Tom Joannem, et al.. Study and test of the rebuncher for SARAF-LINAC phase II. Nucl.Instrum.Meth.A, 2021, 986, pp.164716. ⟨10.1016/j.nima.2020.164716⟩. ⟨hal-02987508⟩
77 Consultations
13 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More