Lot-sizing in a multi-stage flow line production system with energy consideration

Hicham Chehade
  • Fonction : Auteur
  • PersonId : 952568

Résumé

In this paper, a single-item capacitated lot-sizing problem in a flow-shop system with energy consideration is studied. The planning horizon is defined by a set of periods where each one is characterised by a length, an allowed maximal power, an electricity price, a power price and a demand. The objective is to determine the quantities to be produced by each machine at each period while minimising the production cost in terms of electrical, inventory, set-up and power required costs. For medium- and large-scale problems, lot-sizing problems are hard to solve. Therefore, in this study, two heuristics are developed to solve this problem in a reasonable time. To evaluate the performances of these heuristics, computational experiments are presented and numerical results are discussed and analysed.
Fichier non déposé

Dates et versions

hal-02495942 , version 1 (02-03-2020)

Identifiants

Citer

Oussama Masmoudi, Alice Yalaoui, Yassine Ouazene, Hicham Chehade. Lot-sizing in a multi-stage flow line production system with energy consideration. International Journal of Production Research, 2014, 55 (6), pp.1640-1663. ⟨10.1080/00207543.2016.1206670⟩. ⟨hal-02495942⟩

Collections

CNRS UTT LOSI
16 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More