Electric fuses operation, a review: 1. Pre-arcing period - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue IOP Conference Series: Materials Science and Engineering Année : 2012

Electric fuses operation, a review: 1. Pre-arcing period

Résumé

Electrical needs are continously growing because of many various factors linked to increasing consumption and a green perception. This development – geographical, increasing production, growth of transport network, interconnection of continental networks, diversity of the transport technologies … – can not be dissociated from electrical safety considerations whatever the voltage level. For the three main levels of electric network – High Voltage, Middle Voltage and Low Voltage – one has to provide efficient electrical safety techniques or schemas which integrate different electrical safety apparatus. Among well-known apparatus we can cite SF6 breakers, HV and MV switchgears (such as MV cells, MV and LV high current vacuum switchgears), and fuses. Electrical fuses are especially used in the MV and LV domains, sometimes as an additional safety device and sometimes as the main electrical safety component which is linked to the electrical current breaking function of electric fuse. In the paper, we will quickly depict the various kinds of electric fuses. We will especially focuss on the physical mechanisms – whatever the type of work, experimental, theoretical, modelling or empirical – prevailing during the pre-arcing period of the electric fuse operation.

Dates et versions

hal-01153171 , version 1 (19-05-2015)

Identifiants

Citer

William Bussiere. Electric fuses operation, a review: 1. Pre-arcing period. IOP Conference Series: Materials Science and Engineering, 2012, 1st International Symposium on Electrical Arc and Thermal Plasmas in Africa (ISAPA) 17–22 October 2011, Ouagadougou, Burkina Faso, 29 (1), pp.012001. ⟨10.1088/1757-899X/29/1/012001⟩. ⟨hal-01153171⟩
52 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More