Supervision of an industrial plant subject to a maximal duration constraint - Archive ouverte HAL Access content directly
Conference Papers Year : 2008

Supervision of an industrial plant subject to a maximal duration constraint

Abstract

This paper presents a method for the supervision of an industrial plant. This supervision is aimed at guaranteeing the respect of a maximal duration constraint for some specific processing, and is addressed by considering a discrete event system model for this industrial plant. In this associated model, the time constraint is reduced to elementary constraints whose contributions are taken into account in the state equation of the system, yielding a constrained state equation for the plant. Supervisors are then synthesized by looking for solutions of this constrained state equation.

Domains

Automatic
Fichier principal
Vignette du fichier
WODES08_publie.pdf (543.33 Ko) Télécharger le fichier
Origin : Publisher files allowed on an open archive
Loading...

Dates and versions

hal-00362877 , version 1 (19-02-2009)

Identifiers

  • HAL Id : hal-00362877 , version 1

Cite

Abdourrahmane Atto, Claude Martinez, Saïd Amari. Supervision of an industrial plant subject to a maximal duration constraint. 9th International Workshop on Discrete Event Systems, May 2008, Göteborg, Sweden. pp.254-259. ⟨hal-00362877⟩
141 View
205 Download

Share

Gmail Facebook X LinkedIn More