Assembly Preparation of the IFMIF SRF Cryomodule - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2017

Assembly Preparation of the IFMIF SRF Cryomodule

Résumé

This article presents the preparation work performed by CEA for the assembly of the IFMIF Cryomodule. Before the shipping of the components to Japan many tests and trial assemblies has been realized on the CEA site of Saclay, France. The cryomodule, which is part of the Linear IFMIF Prototype Accelerator (LIPAc) under construction at Rokkasho in Japan, will be assembled there under the responsibility of F4E (Fusion for Energy) with CEA assistance. To fulfill the assembly of the cavity string, a cleanroom will be built at Rokkasho under the responsibility of QST.
Fichier non déposé

Dates et versions

hal-01645977 , version 1 (23-11-2017)

Identifiants

Citer

Janic Chambrillon, Nicolas Bazin, Patrice Charon, Pascal Contrepois, Guillaume Devanz, et al.. Assembly Preparation of the IFMIF SRF Cryomodule. 8th International Particle Accelerator Conference, May 2017, Copenhagen, Denmark. pp.MOPVA043, ⟨10.18429/JACoW-IPAC2017-MOPVA043⟩. ⟨hal-01645977⟩
74 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More