Manufacturing and Validation Tests of IFMIF Low-Beta HWRs - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2017

Manufacturing and Validation Tests of IFMIF Low-Beta HWRs

Résumé

The IFMIF accelerator aims to provide an accelerator-based D-Li neutron source to produce high intensity high energy neutron flux to test samples as possible candidate materials to a full lifetime of fusion energy reactors. A prototype of the low energy part of the accelerator is under construction at Rokkasho in Japan. It includes one cryomodule containing 8 half-wave resonators (HWR) operating at 175 MHz .The first manufactured HWR has passed low power tests at 4.2K in vertical cryostat succesfully and exceeds the specifications. It has also been tested in the dedicated horizontal Sathori cryostat equiped with its cold tuning system. The serial production and qualification tests of the 8 cavities which will eventually equip the cryomodule are carried out in parallel. In this paper, we focus on the HWR preparation and test results and give a status of the manufacturing activities.
Fichier non déposé

Dates et versions

hal-01645973 , version 1 (23-11-2017)

Identifiants

Citer

Guillaume Devanz, Nicolas Bazin, Pol Carbonnier, Janic Chambrillon, Patrice Charon, et al.. Manufacturing and Validation Tests of IFMIF Low-Beta HWRs. 8th International Particle Accelerator Conference, May 2017, Copenhagen, Denmark. pp.MOPVA039, ⟨10.18429/JACoW-IPAC2017-MOPVA039⟩. ⟨hal-01645973⟩
54 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More