An Optimal Integrated Maintenance for Multi Parallel Workstations Under Returned Products - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2015

An Optimal Integrated Maintenance for Multi Parallel Workstations Under Returned Products

Résumé

This paper treaties an integrated maintenance problem of manufacturing system with considering a returned products and leasing constraints. We have established an economical production policy and an optimal maintenance strategy for a production system composed by numerous parallels workstations. The system contains a numerous machines to meet a random demands, respecting a certain service level and with considering the returned product (withdrawal right). Firstly, to obtain an economical production planning, we minimize the total production cost. Secondly, according to obtained production plan, we determine the optimal maintenance strategy for different leased machines. The main is to show the impact of the returned products on the production plan and the production rates on the degradation degree of machines.
Fichier principal
Vignette du fichier
IEEM 2015.pdf (1.68 Mo) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-01338334 , version 1 (28-06-2016)

Identifiants

Citer

Tarek Askri, Zied Hajej, Nidhal Rezg. An Optimal Integrated Maintenance for Multi Parallel Workstations Under Returned Products. IEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2015),, Dec 2015, Singapour, Singapore. pp.747-751, ⟨10.1109/IEEM.2015.7385747⟩. ⟨hal-01338334⟩
176 Consultations
108 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More