Optimization of management strategies applied to the national reinforced concrete bridge stock in France - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue Structure and Infrastructure Engineering: Maintenance, Management, Life-Cycle Design and Performance Année : 2009

Optimization of management strategies applied to the national reinforced concrete bridge stock in France

Résumé

The increasing age of national highway bridge stocks demands novel management policies that can maintain or increase safety levels in the light of reducing and budgets from the government. The French Highways Agency uses its Image Qualite Ouvrages d'Art - Structural Quality Imaging (IQOA) inspection programme to determine the conditions of its bridges. The present paper principally describes the development of a model to predict different trends in bridge condition rating in the light of different management strategies. Whilst the approach described is intended to be a general method for managing bridges, it will be demonstrated by particular reference to the stock of reinforced concrete bridges managed by the French Highways Agency. The prediction model utilises Markov chains, which were chosen because they allow a non-parametric discrete model to be built, to evaluate the varying condition of the whole bridge stock over time. The development of the model is described in detail, together with how the hypotheses for applying the Markov chains were validated to accurately predict the transition matrices between different IQOA states. The paper then goes on to describe how the model is used to differentiate between different management strategies, and to predict how future costs can be optimised to give the most efficient management actions across the whole bridge stock under different constraints.

Domaines

Autre
Fichier non déposé

Dates et versions

hal-00613667 , version 1 (05-08-2011)

Identifiants

Citer

André Orcesi, Christian Cremona. Optimization of management strategies applied to the national reinforced concrete bridge stock in France. Structure and Infrastructure Engineering: Maintenance, Management, Life-Cycle Design and Performance, 2009, 5 (5), pp 355-366. ⟨10.1080/15732470701317800⟩. ⟨hal-00613667⟩
45 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More