Erratum to "Scheduling of a two-machine flowshop with availability constraints on the first machine" [International Journal of Production Economics 99 (2006)] - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue International Journal of Production Economics Année : 2013

Erratum to "Scheduling of a two-machine flowshop with availability constraints on the first machine" [International Journal of Production Economics 99 (2006)]

Résumé

In Allaoui H., Artiba A., Elmaghraby S.E., Riane F. Scheduling of a two-machine flowshop with availability constraints on the first machine. International Journal of Production Economics 99 (2006) two conditions of optimality for the Johnson sequence are given. We establish in this note that these conditions are false, under the resumable and the non-resumable case. We also point out two incorrect proofs and give evidence that the time complexity of their dynamic approach is very unlikely to be correct
Fichier principal
Vignette du fichier
erratum.pdf (69.11 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-00686067 , version 1 (06-04-2012)

Identifiants

Citer

Christophe Rapine. Erratum to "Scheduling of a two-machine flowshop with availability constraints on the first machine" [International Journal of Production Economics 99 (2006)]. International Journal of Production Economics, 2013, 142, pp.211-212. ⟨10.1016/j.ijpe.2004.12.003⟩. ⟨hal-00686067⟩