A method for the hierarchical planning of structure, dimension and material requirements of manufacturing systems - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue International Journal of Production Research Année : 2010

A method for the hierarchical planning of structure, dimension and material requirements of manufacturing systems

Thorsten Timm
  • Fonction : Auteur
  • PersonId : 904467

Résumé

Growing competition creates pressure among companies to run their production in a cost optimal way and yet adapt immediately to changes in their environmental conditions. Decisions must always consider the integration of the companies in globalised markets on both the demand and supply side. This paper deals with the optimal planning of decisions concerning the structure and dimension of production facilities. The methods used for material requirements planning (MRP) are selected and configured according to these decisions. These decision problems are represented in the form of four hierarchically layered partial models, each of them realised and iteratively solved by a mathematical optimisation model. The hierarchical planning method is evaluated using a practical case example based on a valve production system of a manufacturing company.

Mots clés

Fichier principal
Vignette du fichier
PEER_stage2_10.1080%2F00207543.2010.495735.pdf (398.2 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-00603443 , version 1 (25-06-2011)

Identifiants

Citer

Thorsten Timm, Alexander Blecken. A method for the hierarchical planning of structure, dimension and material requirements of manufacturing systems. International Journal of Production Research, 2010, pp.1. ⟨10.1080/00207543.2010.495735⟩. ⟨hal-00603443⟩

Collections

PEER
128 Consultations
147 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More