Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: a case study - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue International Journal of Production Research Année : 2009

Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: a case study

Arianna Alfieri
  • Fonction : Auteur correspondant
  • PersonId : 875656

Connectez-vous pour contacter l'auteur

Résumé

We study a real-life multiple objective flowshop scheduling problem in a cardboard company which differs from the conventional flowshop scheduling problem in several aspects, such as multi-machine stations, sequence-dependent setup times, work calendars on resources, reentrant flows, external operations, and transfer batches between stations. We present a simulation-based environment in which the production sequence can be interactively chosen by the user or found by a tabu-search based heuristic algorithm while a discrete-event simulation deals with the timing aspect.

Mots clés

Fichier principal
Vignette du fichier
PEER_stage2_10.1080%2F00207540802010823.pdf (1.13 Mo) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-00513030 , version 1 (01-09-2010)

Identifiants

Citer

Arianna Alfieri. Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: a case study. International Journal of Production Research, 2009, 47 (18), pp.5129-5145. ⟨10.1080/00207540802010823⟩. ⟨hal-00513030⟩

Collections

PEER
31 Consultations
189 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More