H. Abedinnia, C. H. Glock, M. Schneider, and E. H. Grosse, Machine scheduling problems in production: A tertiary study, Computers & Industrial Engineering, vol.111, 2017.
DOI : 10.1016/j.cie.2017.06.026

P. Albertelli, Energy saving opportunities in direct drive machine tool spindles, Journal of Cleaner Production, vol.165, pp.855-873, 2017.
DOI : 10.1016/j.jclepro.2017.07.175

E. Angel, E. Bampis, and V. Chau, Low Complexity Scheduling Algorithm Minimizing the Energy for Tasks with Agreeable Deadlines, 2012.
URL : https://hal.archives-ouvertes.fr/hal-00742350

E. Angel, E. Bampis, V. Chau, and D. Letsios, Throughput Maximization for Speed?Scaling with Agreeable Deadlines, 2013.
DOI : 10.1007/s10951-015-0452-y

URL : https://hal.archives-ouvertes.fr/hal-00832024

E. Angel, E. Bampis, V. Chau, and N. Thang, Throughput Maximization in Multiprocessor Speed?Scaling, 2014.
URL : https://hal.archives-ouvertes.fr/hal-01113808

E. Angel, E. Bampis, F. Kacem, and D. Letsios, Speed Scaling on Parallel Processors with Migration, Lecture Notes in Computer Science, vol.7484, issue.1, pp.128-140, 2011.
DOI : 10.1007/978-3-642-32820-6_15

URL : https://hal.archives-ouvertes.fr/hal-00741604

A. Pacific, E. Research-centre, and A. , Apec energy demand and supply outlook ? 5th edition, Asia?Pacific Economic Cooperation, 2013.

J. Elias, C. Arroyo, and Y. T. Leung, An effective iterated greedy algorithm for scheduling unrelated parallel batch machines with non?identical capacities and unequal ready times, Computers & Industrial Engineering, vol.105, pp.84-100, 2017.

J. Elias, C. Arroyo, and Y. T. Leung, Scheduling unrelated parallel batch processing machines with non?identical job sizes and unequal ready times, Computers & Operations Research, vol.78, pp.117-128, 2017.

M. Azizoglu and S. Webster, Scheduling a batch processing machine with non-identical job sizes, International Journal of Production Research, vol.38, issue.10, pp.2173-2184, 2000.
DOI : 10.1080/00207540050028034

E. Bampis and D. Letsios, Ioannis Milis, and Georgios Zois. Speed Scaling for Maximum Lateness, 2013.

P. Baptiste and A. Jouglet, On Minimizing Total Tardiness in a Serial Batching Problem, RAIRO - Operations Research, vol.43, issue.1, pp.107-115, 2001.
DOI : 10.1287/opre.43.4.692

URL : https://hal.archives-ouvertes.fr/hal-01378286

S. Bechikh, B. Said, and K. Ghedira, Estimating nadir point in multi-objective optimization using mobile reference points, IEEE Congress on Evolutionary Computation, pp.1-9, 2010.
DOI : 10.1109/CEC.2010.5586203

A. Bensmaine, M. Dahane, and L. Benyoucef, A non-dominated sorting genetic algorithm based approach for optimal machines selection in reconfigurable manufacturing environment, Computers & Industrial Engineering, vol.66, issue.3, pp.519-524, 2013.
DOI : 10.1016/j.cie.2012.09.008

URL : https://hal.archives-ouvertes.fr/hal-01479698

J. Van-den, J. Bergh, P. Beliën, E. De-bruecker, L. Demeulemeester et al., Personnel scheduling: A literature review, European Journal of Operational Research, vol.226, issue.3, pp.367-385, 2013.
DOI : 10.1016/j.ejor.2012.11.029

J. Bérubé, M. Gendreau, and J. Potvin, An exact -constraint method for bi-objective combinatorial optimization problems: Application to the Traveling Salesman Problem with Profits, European Journal of Operational Research, vol.194, issue.1, pp.39-50, 2009.
DOI : 10.1016/j.ejor.2007.12.014

A. Bruzzone, . Anghinolfi, F. Paolucci, and . Tonelli, Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops, Massimiliano Caramia and Paolo Delî A´Olmo. Multi?objective Management in Freight Logistics, pp.459-462, 2008.
DOI : 10.1016/j.cirp.2012.03.084

V. Chandru, C. Lee, and R. Uzsoy, Minimizing total completion time on batch processing machines, International Journal of Production Research, vol.6, issue.9, pp.2097-2121, 1993.
DOI : 10.1080/00207548808947934

V. Chandru, C. Lee, and R. Uzsoy, Minimizing total completion time on a batch processing machine with job families, Operations Research Letters, vol.13, issue.2, pp.61-65, 1993.
DOI : 10.1016/0167-6377(93)90030-K

P. Chang, P. Damodaran, and S. Melouk, Minimizing makespan on parallel batch processing machines, International Journal of Production Research, vol.45, issue.19, pp.4211-4220, 2004.
DOI : 10.1080/07408178708975376

A. Charnes and W. W. Cooper, Management models and industrial applications of linear programming volumes I and II, 1961.

A. Charnes, W. W. Cooper, and R. O. Ferguson, Optimal Estimation of Executive Compensation by Linear Programming, Management Science, vol.1, issue.2, pp.138-151, 1955.
DOI : 10.1287/mnsc.1.2.138

A. Che, K. Lv, E. Levner, and V. Kats, Energy consumption minimization for single machine scheduling with bounded maximum tardiness, 2015 IEEE 12th International Conference on Networking, Sensing and Control
DOI : 10.1109/ICNSC.2015.7116025

A. Che, X. Wu, J. Peng, and P. Yan, Energy-efficient bi-objective single-machine scheduling with power-down mechanism, Computers & Operations Research, vol.85, pp.172-183, 2017.
DOI : 10.1016/j.cor.2017.04.004

A. Che, Y. Zeng, and K. Lyu, An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs, Journal of Cleaner Production, vol.129, pp.565-577, 2016.
DOI : 10.1016/j.jclepro.2016.03.150

H. Chen, B. Du, Q. George, and . Huang, Metaheuristics to minimise makespan on parallel batch processing machines with dynamic job arrivals, International Journal of Computer Integrated Manufacturing, vol.14, issue.7, pp.942-956, 2010.
DOI : 10.1108/09576060310491937

H. Chen, B. Du, Q. George, and . Huang, Scheduling a batch processing machine with non-identical job sizes: a clustering perspective, International Journal of Production Research, vol.32, issue.19, pp.5755-5778, 2011.
DOI : 10.1002/nav.4

Y. Ba, Y. T. Cheng, K. Leung, and . Li, Integrated scheduling on a batch machine to minimize production, inventory and distribution costs, European Journal of Operational Research, vol.258, issue.1, pp.104-112, 2016.

J. Cheng, F. Chu, C. Chu, and W. Xia, Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices, RAIRO - Operations Research, vol.14, issue.4-5, pp.4-5715, 2016.
DOI : 10.1016/B978-0-444-63234-0.50068-3

URL : https://hal.archives-ouvertes.fr/hal-01273066

S. H. Chung, Y. T. Tai, and W. L. Pearn, Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes, International Journal of Production Research, vol.34, issue.18, pp.5109-5128, 2009.
DOI : 10.1080/00207540412331270450

C. A. Coello, G. T. Pulido, and M. S. Lechuga, Handling multiple objectives with particle swarm optimization, IEEE Transactions on Evolutionary Computation, vol.8, issue.3, pp.256-279, 2004.
DOI : 10.1109/TEVC.2004.826067

Y. Cui, Z. Geng, Q. Zhu, and Y. Han, Review: Multi-objective optimization methods and application in energy saving, Energy, vol.125, pp.681-704, 2017.
DOI : 10.1016/j.energy.2017.02.174

P. Czyz?zak and A. Jaszkiewicz, Pareto simulated annealing?a metaheuristic technique for multiple ?objective combinatorial optimization, Journal of Multi?criteria Decision Analysis, vol.7, 1998.

P. Damodaran and P. Y. Chang, Heuristics to minimize makespan of parallel batch processing machines [39] Purushothaman Damodaran, Don Asanka Diyadawagamage, Omar Ghrayeb, and Mario C. Vélez-Gallego. A particle swarm optimization algorithm for minimizing makespan of nonidentical parallel batch processing machines, International Journal of Advanced Manufacturing Technology International Journal of Advanced Manufacturing Technology, vol.37, issue.58, pp.9-101005, 2008.

P. Damodaran, S. Neal, M. C. Hirani, and . Velez-gallego, Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms, European J. of Industrial Engineering, vol.3, issue.2, pp.187-206, 2009.
DOI : 10.1504/EJIE.2009.023605

P. Damodaran, P. Kumar-manjeshwar, and K. Srihari, Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms, International Journal of Production Economics, vol.103, issue.2, pp.882-891, 2006.
DOI : 10.1016/j.ijpe.2006.02.010

I. Das, E. John, and . Dennis, A closer look at drawbacks of minimizing weighted sums of objectives for pareto set generation in multicriteria optimization problems. Structural optimization, pp.63-69, 1997.

K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan, A fast and elitist multiobjective genetic algorithm: NSGA-II, IEEE Transactions on Evolutionary Computation, vol.6, issue.2, pp.182-197, 2002.
DOI : 10.1109/4235.996017

K. Deb, Multiobjective optimization using evolutionary algorithms, Computational Optimization & Applications, vol.39, issue.1, pp.75-96, 2001.

K. Deb, S. Agrawal, A. Pratap, and T. Meyarivan, A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimization: NSGA-II, 2000.
DOI : 10.1007/3-540-45356-3_83

E. Demir, T. Bekta¸sbekta¸s, and G. Laporte, The bi-objective Pollution-Routing Problem, European Journal of Operational Research, vol.232, issue.3, pp.464-478, 2014.
DOI : 10.1016/j.ejor.2013.08.002

H. Ding, L. Benyoucef, and X. Xie, A simulation-based multi-objective genetic algorithm approach for networked enterprises optimization, Engineering Applications of Artificial Intelligence, vol.19, issue.6, pp.609-623, 2006.
DOI : 10.1016/j.engappai.2005.12.008

URL : https://hal.archives-ouvertes.fr/emse-00449373

S. Jian-ya-ding, C. Song, and . Wu, Carbon-efficient scheduling of flow shops by multi-objective optimization, European Journal of Operational Research, vol.248, issue.3, pp.758-771, 2016.
DOI : 10.1016/j.ejor.2015.05.019

S. Jian-ya-ding, R. Song, R. Zhang, C. Chiong, and . Wu, Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches, IEEE Transactions on Automation Science and Engineering, vol.13, issue.2, pp.1138-1154, 2016.
DOI : 10.1109/TASE.2015.2495328

L. Dupont and C. Dhaenens-flipo, Minimizing the makespan on a batch machine with non-identical job sizes: an exact procedure, Computers & Operations Research, vol.29, issue.7, pp.807-819, 2002.
DOI : 10.1016/S0305-0548(00)00078-2

L. Dupont and F. Ghazvini, Minimizing makespan on a single batch processing machine with non?identical job sizes, Journal européen des systèmes automatisés, vol.32, issue.4, pp.431-440, 1998.

M. Esmaili, H. A. Shayanfar, and N. Amjady, Multi-objective congestion management incorporating voltage and transient stabilities, Energy, vol.34, issue.9, pp.1401-1412, 2009.
DOI : 10.1016/j.energy.2009.06.041

K. Fang, N. Uhan, F. Zhao, and J. W. Sutherland, A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction, Journal of Manufacturing Systems, vol.30, issue.4, pp.234-240, 2011.
DOI : 10.1016/j.jmsy.2011.08.004

K. Fang, A. Nelson, F. Uhan, J. W. Zhao, and . Sutherland, Flow shop scheduling with peak power consumption constraints, Annals of Operations Research, vol.6, issue.2, pp.115-145, 2013.
DOI : 10.1002/nav.3800060205

K. Fang, A. Nelson, F. Uhan, J. W. Zhao, and . Sutherland, Scheduling on a single machine under time-of-use electricity tariffs, Annals of Operations Research, vol.57, issue.2, pp.199-227, 2016.
DOI : 10.1109/SFCS.1995.492493

M. Fanti, . Maione, B. Piscitelli, and . Turchiano, Heuristic scheduling of jobs on a multi-product batch processing machine, International Journal of Production Research, vol.5, issue.8, pp.2163-2186, 1996.
DOI : 10.1080/00207549408957026

C. Gahm, F. Denz, M. Dirr, and A. Tuma, Energy-efficient scheduling in manufacturing companies: A review and research framework, 58] Carlos GarcíamartínezGarcíamartGarcíamartínez, Oscar Cordón, and Francisco Herrera, pp.744-757116, 2007.
DOI : 10.1016/j.ejor.2015.07.017

L. Ronald, E. Graham, . Lenstra, and . Kan, Optimization and approximation in deterministic sequencing and scheduling: a survey, Annals of Discrete Mathematics, vol.5, pp.287-326, 1979.

C. Stephen and . Graves, A review of production scheduling, Operations Research, pp.646-675, 1981.

T. Gutowski, C. Murphy, D. Allen, D. Bauer, B. Bras et al., Environmentally benign manufacturing: Observations from Japan, Europe and the United States, Journal of Cleaner Production, vol.13, issue.1, pp.1-17, 2005.
DOI : 10.1016/j.jclepro.2003.10.004

H. Isermann, Technical Note???Proper Efficiency and the Linear Vector Maximum Problem, Operations Research, vol.22, issue.1, pp.189-191, 1974.
DOI : 10.1287/opre.22.1.189

H. Hadera and I. Harjunkoski, Continuous-time Batch Scheduling Approach for Optimizing Electricity Consumption Cost, 23rd European Symposium on Computer Aided Process Engineering, p.403, 2013.
DOI : 10.1016/B978-0-444-63234-0.50068-3

I. Halim and R. Srinivasan, Sequential Methodology for Scheduling of Heat-Integrated Batch Plants, Industrial & Engineering Chemistry Research, vol.48, issue.18, pp.8551-8565, 2009.
DOI : 10.1021/ie900367j

M. Pilegaard-hansen and A. Jaszkiewicz, Evaluating the quality of approximations to the non-dominated set, Journal Für Die Reine Und Angewandte Mathematik, vol.405, issue.2, pp.352-356, 1998.

Y. T. Cheng-he, K. Leung, M. L. Lee, and . Pinedo, Scheduling a single machine with parallel batching to minimize makespan and total rejection cost, Discrete Applied Mathematics, vol.204, issue.C, pp.150-163, 2016.

Y. Ikura and M. Gimple, Efficient scheduling algorithms for a single batch processing machine, Operations Research Letters, vol.5, issue.2, pp.61-65, 1986.
DOI : 10.1016/0167-6377(86)90104-5

M. Ji, J. Y. Wang, and W. Lee, Minimizing resource consumption on uniform parallel machines with a bound on makespan, Computers & Operations Research, vol.40, issue.12, pp.2970-2974, 2013.
DOI : 10.1016/j.cor.2013.06.011

K. Zhao-hong-jia, Y. T. Li, and . Leung, Effective heuristic for makespan minimization in parallel batch machines with non?identical capacities, International Journal of Production Economics, vol.169, pp.1-10, 2015.

N. Jozefowiez, F. Semet, and . Talbi, The bi-objective covering tour problem, Computers & Operations Research, vol.34, issue.7, pp.1929-1942, 2007.
DOI : 10.1016/j.cor.2005.07.022

I. Kacem, S. Hammadi, and P. Borne, Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems, IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews), vol.32, issue.1, pp.1-13, 2002.
DOI : 10.1109/TSMCC.2002.1009117

A. Kashan and B. Karimi, Scheduling a single batch-processing machine with arbitrary job sizes and incompatible job families: An ant colony framework, Journal of the Operational Research Society, vol.6, issue.9, pp.1269-1280, 2008.
DOI : 10.1016/S0305-0548(01)00031-4

A. H. Kashan, B. Karimi, and F. Jolai, Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes, International Journal of Production Research, vol.32, issue.12, pp.2337-2360, 2006.
DOI : 10.1016/S0305-0548(01)00031-4

A. Husseinzadeh-kashan, B. Karimi, and S. M. Ghomi, A note on minimizing makespan on a single batch processing machine with nonidentical job sizes, Theoretical Computer Science, vol.410, issue.27-29, pp.4102754-2758, 2009.
DOI : 10.1016/j.tcs.2009.02.014

A. Husseinzadeh-kashan, B. Karimi, and M. Jenabi, A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes, Computers & Operations Research, vol.35, issue.4, pp.1084-1098, 2008.
DOI : 10.1016/j.cor.2006.07.005

D. Kathan, Assessment of demand response and advanced metering: Staff report 2012, 2012.

S. Koh, P. Koo, and J. Ha, Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families, International Journal of Production Research, vol.42, issue.19, pp.4091-410781, 2004.
DOI : 10.1016/S0305-0548(01)00031-4

L. Kong, H. Luo, and H. Li, Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates, Automation in Construction, vol.81, pp.34-43, 2017.
DOI : 10.1016/j.autcon.2017.03.016

C. Lee, Minimizing makespan on a single batch processing machine with dynamic job arrivals, International Journal of Production Research, vol.37, issue.1, pp.219-236, 1999.
DOI : 10.1080/002075499192020

C. Lee, R. Uzsoy, and L. , Efficient Algorithms for Scheduling Semiconductor Burn-In Operations, Operations Research, vol.40, issue.4, pp.764-775, 1992.
DOI : 10.1287/opre.40.4.764

M. Leitner, I. Ljubi´cljubi´c, and M. Sinnl, Solving the bi-objective prize-collecting Steiner tree problem with the ??-constraint method, Electronic Notes in Discrete Mathematics, vol.41, pp.181-188, 2013.
DOI : 10.1016/j.endm.2013.05.091

P. Leyman and M. Vanhoucke, A new scheduling technique for the resource???constrained project scheduling problem with discounted cash flows, International Journal of Production Research, vol.53, issue.9, pp.2771-2786, 2015.
DOI : 10.1002/(SICI)1520-6750(199912)46:8<912::AID-NAV3>3.0.CO;2-C

C. Lun, L. , and C. Y. Lee, Scheduling with agreeable release times and due dates on a batch processing machine, European Journal of Operational Research, vol.96, issue.3, pp.564-569, 1997.

L. Li, Z. Sun, and Z. Tang, Real time electricity demand response for sustainable manufacturing systems: Challenges and a case study, 2012 IEEE International Conference on Automation Science and Engineering (CASE), pp.353-357, 2012.
DOI : 10.1109/CoASE.2012.6386437

S. Li, Parallel batch scheduling with inclusive processing set restrictions and non-identical capacities to minimize makespan, European Journal of Operational Research, vol.260, issue.1, pp.12-20, 2016.
DOI : 10.1016/j.ejor.2016.11.044

S. Li, G. Li, X. Wang, and Q. Liu, Minimizing makespan on a single batching machine with release times and non-identical job sizes, Operations Research Letters, vol.33, issue.2
DOI : 10.1016/j.orl.2004.04.009

X. Li, Research on Scheduling Batch Processing Machines in Parallel, 2012.

X. Li, H. Chen, B. Du, and Q. Tan, Heuristics to schedule uniform parallel batch processing machines with dynamic job arrivals, International Journal of Computer Integrated Manufacturing, vol.26, issue.5, pp.474-486, 2013.
DOI : 10.1002/nav.4

X. Li, Y. Huang, Q. Tan, and H. Chen, Scheduling unrelated parallel batch processing machines with non-identical job sizes, Computers & Operations Research, vol.40, issue.12, pp.2983-2990, 2013.
DOI : 10.1016/j.cor.2013.06.016

Z. Li, H. Chen, R. Xu, and X. Li, Earliness???tardiness minimization on scheduling a batch processing machine with non-identical job sizes, Computers & Industrial Engineering, vol.87
DOI : 10.1016/j.cie.2015.06.008

C. Liu and D. Huang, Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms, International Journal of Production Research, vol.76, issue.2, pp.337-352, 2014.
DOI : 10.1049/iet-gtd.2010.0105

P. Liu, F. Liu, and H. Qiu, A novel approach for acquiring the real-time energy efficiency of machine tools, Energy, vol.121, pp.524-532, 2017.
DOI : 10.1016/j.energy.2017.01.047

L. Lu and J. Yuan, Unbounded parallel batch scheduling with job delivery to minimize makespan, Operations Research Letters, vol.36, issue.4, pp.477-480, 2008.
DOI : 10.1016/j.orl.2008.01.006

S. Lu, H. Feng, and X. Li, Minimizing the makespan on a single parallel batching machine, Theoretical Computer Science, vol.411, issue.7-9, pp.1140-1145, 2010.
DOI : 10.1016/j.tcs.2009.12.008

H. Luo, B. Du, Q. George, H. Huang, X. Chen et al., Hybrid flow shop scheduling considering machine electricity consumption cost, International Journal of Production Economics, vol.146, issue.2, pp.423-439, 2007.
DOI : 10.1016/j.ijpe.2013.01.028

M. Mathirajan, V. Chandru, and A. I. Sivakumar, Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries, Sadhana, vol.33, issue.11, pp.479-500, 2007.
DOI : 10.1080/07408170108936855

M. Mathirajan and A. Sivakumar, A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor, The International Journal of Advanced Manufacturing Technology, vol.32, issue.9-10, pp.9-10990, 2006.
DOI : 10.1017/S0269964801152071

G. Mavrotas, Effective implementation of the ??-constraint method in Multi-Objective Mathematical Programming problems, Applied Mathematics and Computation, vol.213, issue.2, pp.455-465, 2009.
DOI : 10.1016/j.amc.2009.03.037

S. Melouk, P. Damodaran, and P. Y. Chang, Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing, International Journal of Production Economics, vol.87, issue.2, pp.141-147, 2004.
DOI : 10.1016/S0925-5273(03)00092-6

H. Mokhtari and A. Hasani, An energy-efficient multi-objective optimization for flexible job-shop scheduling problem, Computers & Chemical Engineering, vol.104, pp.339-352, 2017.
DOI : 10.1016/j.compchemeng.2017.05.004

J. Moon, K. Shin, and J. Park, Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency, The International Journal of Advanced Manufacturing Technology, vol.28, issue.3, pp.1-4523, 2013.
DOI : 10.1080/00207729708929359

J. Moon, K. Shin, and J. Park, Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency, The International Journal of Advanced Manufacturing Technology, vol.28, issue.3, pp.1-4523, 2013.
DOI : 10.1080/00207729708929359

B. Mor and G. Mosheiov, Batch scheduling on uniform machines to minimize total flow-time, Computers & Operations Research, vol.39, issue.3, pp.571-575, 2012.
DOI : 10.1016/j.cor.2011.05.014

G. Mouzon, B. Mehmet, and . Yildirim, A framework to minimise total energy consumption and total tardiness on a single machine, International Journal of Sustainable Engineering, vol.1, issue.2, pp.105-116, 2008.
DOI : 10.1145/1165780.1165781

G. Mouzon, B. Mehmet, J. Yildirim, and . Twomey, Operational methods for minimization of energy consumption of manufacturing equipment, International Journal of Production Research, vol.85, issue.18-19, pp.18-194247, 2007.
DOI : 10.1109/92.335012

T. Okabe, Y. Jin, and B. Sendhoff, A critical survey of performance indices for multi-objective optimisation, The 2003 Congress on Evolutionary Computation, 2003. CEC '03., pp.878-885, 2003.
DOI : 10.1109/CEC.2003.1299759

D. Pisinger, A Minimal Algorithm for the 0-1 Knapsack Problem, Operations Research, vol.45, issue.5, pp.758-767, 1997.
DOI : 10.1287/opre.45.5.758

D. Pisinger, An exact algorithm for large multiple knapsack problems, European Journal of Operational Research, vol.114, issue.3, pp.528-541, 1999.
DOI : 10.1016/S0377-2217(98)00120-9

N. Chris, . Potts, Y. Mikhail, and . Kovalyov, Scheduling with batching: a review, European Journal of Operational Research, vol.120, issue.2, pp.228-249, 2000.

M. Pranzo, Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times, European Journal of Operational Research, vol.153, issue.3, pp.581-592, 2004.
DOI : 10.1016/S0377-2217(03)00264-9

M. Rager, C. Gahm, and F. Denz, Energy-oriented scheduling based on Evolutionary Algorithms, Computers & Operations Research, vol.54, pp.218-231, 2015.
DOI : 10.1016/j.cor.2014.05.002

P. Reiter, J. Walter, and . Gutjahr, Exact hybrid algorithms for solving a bi-objective vehicle routing problem, Central European Journal of Operations Research, vol.4403, issue.2, pp.19-43, 2012.
DOI : 10.1007/978-3-540-70928-2_64

A. Riise, C. Mannino, and E. K. Burke, Modelling and solving generalised operational surgery scheduling problems, Computers & Operations Research, vol.66, pp.1-11, 2016.
DOI : 10.1016/j.cor.2015.07.003

R. Jason and . Schott, Fault tolerant design using single and multicriteria genetic algorithm optimization, 1995.

B. Shahidi-zadeh, R. Tavakkoli-moghaddam, A. Taheri-moghadam, and I. Rastgar, Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study, Computers & Operations Research, vol.88, pp.71-90, 2017.
DOI : 10.1016/j.cor.2017.06.019

F. Shrouf, J. Ordieres-meré, A. García-sánchez, and M. Ortega-mier, Optimizing the production scheduling of a single machine to minimize total energy consumption costs, Journal of Cleaner Production, vol.67, pp.197-207, 2014.
DOI : 10.1016/j.jclepro.2013.12.024

N. Suhaimi, C. Nguyen, and P. Damodaran, Lagrangian approach to minimize makespan of non-identical parallel batch processing machines, Computers & Industrial Engineering, vol.101, pp.295-302, 2016.
DOI : 10.1016/j.cie.2016.09.018

S. Chang, Y. Sung, and . Choung, Minimizing makespan on a single burn?in oven in semiconductor manufacturing, European Journal of Operational Research, vol.120, issue.3, pp.559-574, 2000.

V. Swaminathan and K. Chakrabarty, Energy-conscious, deterministic i/o device scheduling in hard real-time systems, IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, vol.22, issue.7, pp.847-858, 2003.
DOI : 10.1109/TCAD.2003.814245

K. C. Tan, C. K. Goh, Y. J. Yang, and T. H. Lee, Evolving better population distribution and exploration in evolutionary multi-objective optimization, European Journal of Operational Research, vol.171, issue.2
DOI : 10.1016/j.ejor.2004.08.038

L. Tang, X. Zhao, J. Liu, and Y. T. Leung, Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine, European Journal of Operational Research, vol.263, issue.2, 2017.
DOI : 10.1016/j.ejor.2017.05.019

T. Vincent, J. C. Kindt, and . Billaut, Multicriteria Scheduling: Theory, Models and Algorithms, 2005.

F. Tricoire, A. Graf, and W. J. Gutjahr, The bi-objective stochastic covering tour problem, Computers & Operations Research, vol.39, issue.7, pp.1582-1592, 2012.
DOI : 10.1016/j.cor.2011.09.009

R. Uzsoy, Scheduling a single batch processing machine with non-identical job sizes, International Journal of Production Research, vol.32, issue.7, pp.1615-1635, 1994.
DOI : 10.1142/S0960313192000157

R. Uzsoy and Y. Yang, MINIMIZING TOTAL WEIGHTED COMPLETION TIME ON A SINGLE BATCH PROCESSING MACHINE, Production and Operations Management, vol.26, issue.1, pp.57-73, 1997.
DOI : 10.1080/07408179408966627

D. Van-de-rzee, P. Van-harten, and . Schuur, Dynamic job assignment heuristics for multi-server batch operations- A cost based approach, International Journal of Production Research, vol.35, issue.11, pp.3063-3094, 1997.
DOI : 10.1080/002075497194291

A. David, . Van-veldhuizen, B. Gary, and . Lamont, On measuring multiobjective evolutionary algorithm performance, Proceedings of the Congress on Evolutionary Computation, pp.204-211, 2000.

D. A. and V. Veldhuizen, Multiobjective Evolutionary Algorithms: Analyzing the State-of-the-Art, Evolutionary Computation, vol.8, issue.2, pp.125-147, 1999.
DOI : 10.1109/4235.797969

A. David, G. B. Van-veldhuizen, and . Lamont, Multiobjective evolutionary algorithm test suites, ACM Symposium on Applied Computing, pp.351-357, 1999.

C. Shuo, W. , and R. Uzsoy, A genetic algorithm to minimize maximum lateness on a batch processing machine, Computers & Operations Research, vol.29, issue.12, pp.1621-1640, 2002.

S. Wang and M. Liu, A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem, Computers & Operations Research, vol.40, issue.4, pp.1064-1075, 2013.
DOI : 10.1016/j.cor.2012.10.015

S. Wang and M. Liu, A heuristic method for two-stage hybrid flow shop with dedicated machines, Computers & Operations Research, vol.40, issue.1, pp.438-450, 2013.
DOI : 10.1016/j.cor.2012.07.015

S. Wang, M. Liu, F. Chu, and C. Chu, Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration, Journal of Cleaner Production, vol.137, pp.1205-1215, 2016.
DOI : 10.1016/j.jclepro.2016.07.206

URL : https://hal.archives-ouvertes.fr/hal-01388548

Y. Wang and L. Li, Time-of-use based electricity demand response for sustainable manufacturing systems, Energy, vol.63, pp.233-244, 2013.
DOI : 10.1016/j.energy.2013.10.011

J. Wu and S. Azarm, Metrics for Quality Assessment of a Multiobjective Design Optimization Solution Set, Journal of Mechanical Design, vol.34, issue.1, pp.18-25, 2001.
DOI : 10.2514/3.13035

P. Wu, A study on lane reservation problems in transportation networks
URL : https://hal.archives-ouvertes.fr/tel-01758478

P. Wu, A. Che, F. Chu, and M. Zhou, An Improved Exact <inline-formula> <tex-math notation="TeX">$\varepsilon$</tex-math></inline-formula>-Constraint and Cut-and-Solve Combined Method for Biobjective Robust Lane Reservation, IEEE Transactions on Intelligent Transportation Systems, vol.16, issue.3, pp.1479-1492, 2015.
DOI : 10.1109/TITS.2014.2368594

R. Xu, H. Chen, and X. Li, Makespan minimization on single batch-processing machine via ant colony optimization, Computers & Operations Research, vol.39, issue.3, pp.582-593, 2012.
DOI : 10.1016/j.cor.2011.05.011

S. Xu and J. C. Bean, A Genetic Algorithm for Scheduling Parallel Non-identical Batch Processing Machines, 2007 IEEE Symposium on Computational Intelligence in Scheduling, pp.143-150, 2007.
DOI : 10.1109/SCIS.2007.367682

M. Bayram, Y. , and G. Mouzon, Single?machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm. Engineering Management, IEEE Transactions on, vol.59, issue.4, pp.585-597, 2012.

Y. Yin, T. C. , E. Cheng, D. Wang, and C. C. Wu, Improved Algorithms for Single-Machine Serial-Batch Scheduling With Rejection to Minimize Total Completion Time and Total Rejection Cost, IEEE Transactions on Systems, Man, and Cybernetics: Systems, vol.46, issue.11, pp.1-11, 2015.
DOI : 10.1109/TSMC.2015.2505644

L. Zadeh, Optimality and non-scalar-valued performance criteria, IEEE Transactions on Automatic Control, vol.8, issue.1, pp.59-60, 1963.
DOI : 10.1109/TAC.1963.1105511

G. Zhang, X. Cai, C. Lee, and C. Wong, Minimizing makespan on a single batch processing machine with nonidentical job sizes, Naval Research Logistics, vol.32, issue.3, pp.226-240, 2001.
DOI : 10.1080/00207549408957026

H. Zhang, F. Zhao, K. Fang, and J. W. Sutherland, Energy-conscious flow shop scheduling under time-of-use electricity tariffs, CIRP Annals, vol.63, issue.1, pp.37-40, 2014.
DOI : 10.1016/j.cirp.2014.03.011

R. Zhang, P. Chang, S. Song, and C. Wu, A multi-objective artificial bee colony algorithm for parallel batch-processing machine scheduling in fabric dyeing processes, Knowledge-Based Systems, vol.116, pp.114-129, 2017.
DOI : 10.1016/j.knosys.2016.10.026

Y. Zhang, Z. Cao, and Q. Bai, A PTAS for Scheduling on Agreeable Unrelated Parallel Batch Processing Machines with Dynamic Job Arrivals, International Conference on Algorithmic Applications in Management, pp.162-171, 2005.
DOI : 10.1007/11496199_19

S. Zhou, H. Chen, and X. Li, Distance matrix based heuristics to minimize makespan of parallel batch processing machines with arbitrary job sizes and release times, Applied Soft Computing, vol.52, pp.630-641, 2017.
DOI : 10.1016/j.asoc.2016.10.008

S. Zhou, H. Chen, R. Xu, and X. Li, Minimising makespan on a single batch processing machine with dynamic job arrivals and non-identical job sizes, International Journal of Production Research, vol.52, issue.8, pp.2258-2274, 2014.
DOI : 10.1002/nav.4

S. Zhou, M. Liu, H. Chen, and X. Li, An effective discrete differential evolution algorithm for scheduling uniform parallel batch processing machines with non-identical capacities and arbitrary job sizes, International Journal of Production Economics, vol.179, pp.1-11, 2016.
DOI : 10.1016/j.ijpe.2016.05.014

Z. Zhou, F. Chu, A. Che, and M. Zhou, $\varepsilon$-Constraint and Fuzzy Logic-Based Optimization of Hazardous Material Transportation via Lane Reservation, IEEE Transactions on Intelligent Transportation Systems, vol.14, issue.2, pp.847-857, 2013.
DOI : 10.1109/TITS.2013.2243836

E. Zitzler, Evolutionary algorithms for multiobjective optimization: Methods and applications, 1999.

E. Zitzler, J. Knowles, and L. Thiele, Quality Assessment of Pareto Set Approximations, Multiobjective Optimization, pp.373-404, 2008.
DOI : 10.1007/978-3-540-70928-2_64

E. Zitzler, M. Laumanns, and L. Thiele, Spea2: Improving the strength pareto evolutionary algorithm for multiobjective optimization In Evolutionary Methods for Design, Optimization and Control with Applications To Industrial Problems Multiobjective Optimization Using Evolutionary Algorithms ? A Comparative Case Study, Proceedings of the Eurogen'2001. Athens. Greece, 1998.

E. Zitzler and L. Thiele, Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach, IEEE Transactions on Evolutionary Computation, vol.3, issue.4, pp.257-271, 1999.
DOI : 10.1109/4235.797969

E. Zitzler, L. Thiele, M. Laumanns, M. Carlos, V. Fonseca et al., Performance assessment of multiobjective optimizers: an analysis and review, IEEE Transactions on Evolutionary Computation, vol.7, issue.2, pp.117-132, 2003.
DOI : 10.1109/TEVC.2003.810758

M. Publications, J. , J. Cheng, F. Chu, and M. Zhou, An improved model for parallel machine scheduling under time?of?use electricity price, IEEE Transactions on Automation Science and Engineering, 2017.

J. Cheng, F. Chu, C. Chu, and W. Xia, Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices, RAIRO - Operations Research, vol.14, issue.4-5, pp.4-5715, 2016.
DOI : 10.1016/B978-0-444-63234-0.50068-3

URL : https://hal.archives-ouvertes.fr/hal-01273066

J. Cheng, F. Chu, M. Liu, P. Wu, and W. Xia, Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs, Computers & Industrial Engineering, vol.112, pp.721-734, 2017.
DOI : 10.1016/j.cie.2017.04.026

URL : https://hal.archives-ouvertes.fr/hal-01524591

J. Cheng, F. Chu, M. Liu, and W. Xia, Effective heuristics for single machine batch scheduling under time-of-use tariffs

J. Conference, F. Cheng, M. Chu, W. Liu, . J. Xia et al., Electricity cost and makespan optimization on a single batch processing machine under time?of?use pricing policy Single?machine batch scheduling under time?of?use tariffs: new mixed?integer programming approaches, 45th International Conference on Computers & Industrial Engineering 2016 IEEE International conference on Systems, Man, and Cybernetics 2016. J. Cheng, F. Chu, and W. Xia. Single machine batch scheduling under time?of?use policy. 16ème16`16ème Conférence ROADEF Société Française de Recherche Opérationnelle et Aidè a la Décision, pp.236-241, 2015.

J. Cheng, F. Chu, W. Xia, J. Ding, and X. Ling, Bi-objective optimization for single-machine batch scheduling considering energy cost, 2014 International Conference on Control, Decision and Information Technologies (CoDIT), pp.236-241, 2014.
DOI : 10.1109/CoDIT.2014.6996899

URL : https://hal.archives-ouvertes.fr/hal-01113800