The Impact of Dynamic Tasks Assignment in Paced Mixed-Model Assembly Line with Moving Workers - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2020

The Impact of Dynamic Tasks Assignment in Paced Mixed-Model Assembly Line with Moving Workers

Résumé

With the rise of mass customization, manufacturing companies are increasingly adopting mixed-model assembly lines. These lines can produce multiple products instead of a single one in a dedicated manufacturing system. Consequently, mixed-model assembly lines can benefit from reconfigurations of the workforce and equipment to adjust the line to the production requirements. This study investigates the impact of dynamic task assignment on the design of a mixed-model assembly line with walking workers. In the dynamic task assignment strategy, the assignment of tasks to stations changes depending on the item sequence. In this work, we propose a scenario-based integer linear program to design such an assembly line. The numerical results show that the dynamic task assignment strategy significantly reduces the number of required workers when compared to the fixed task assignment strategy, but it slightly increases the total equipment costs.
Fichier principal
Vignette du fichier
504014_1_En_59_Chapter.pdf (337.14 Ko) Télécharger le fichier
Origine : Accord explicite pour ce dépôt
Licence : CC BY - Paternité

Dates et versions

hal-02923306 , version 1 (22-06-2023)

Licence

Paternité

Identifiants

Citer

S. Ehsan Ehsan Hashemi-Petroodi, Simon Thevenin, Sergey Kovalev, Alexandre Dolgui. The Impact of Dynamic Tasks Assignment in Paced Mixed-Model Assembly Line with Moving Workers. APMS 2020: Advances in Production Management Systems. Towards Smart and Digital Manufacturing, Aug 2020, Novi Sad, Serbia. pp.509-517, ⟨10.1007/978-3-030-57997-5_59⟩. ⟨hal-02923306⟩
76 Consultations
44 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More