Remanufacturing: the experience of the United States and implications for developing countries, vol.31, 1984. ,
Production planning and control for remanufacturing: a state-of-the-art survey, Robotics and Computer-Integrated Manufacturing, vol.15, issue.3, pp.221-230, 1999. ,
Production planning and control for remanufacturing: industry practice and research needs, Journal of operations Management, vol.18, issue.4, pp.467-483, 2000. ,
Production planning and control for remanufacturing: literature review and analysis, Production Planning & Control, vol.23, issue.6, pp.419-435, 2012. ,
Environmentally conscious manufacturing and product recovery (ecmpro): a review of the state of the art, Journal of environmental management, vol.91, issue.3, pp.563-591, 2010. ,
Multiperiod remanufacturing planning with uncertain quality of inputs, IEEE Transactions on Engineering Management, vol.57, issue.3, pp.394-404, 2010. ,
A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand, International Journal of Production Research, vol.48, issue.16, pp.4701-4723, 2010. ,
A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system, International Journal of Production Research, vol.47, issue.13, pp.3657-3668, 2009. ,
A mip-based heuristic for the stochastic economic lot sizing problem with remanufacturing, IFAC Proceedings Volumes, vol.46, pp.742-747, 2013. ,
Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints, European Journal of Operational Research, vol.267, issue.3, pp.1102-1109, 2018. ,
Production planning optimization for manufacturing and remanufacturing system in stochastic environment, Journal of Intelligent Manufacturing, pp.1-12, 2013. ,
Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs, The International Journal of Advanced Manufacturing Technology, vol.82, issue.5-8, pp.1241-1257, 2016. ,
Capacitated dynamic production and remanufacturing planning under demand and return uncertainty, OR spectrum, vol.38, issue.4, pp.849-876, 2016. ,
A two-stage robust programming approach to demand-driven disassembly planning for a closed-loop supply chain system, International Journal of Production Research, vol.51, issue.8, pp.2414-2432, 2013. ,
A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning, Journal of Global Optimization, vol.68, issue.4, pp.851-878, 2017. ,
A branch-and-cut algorithm for the stochastic uncapacitated lot-sizing problem, Mathematical Programming, vol.105, issue.1, pp.55-84, 2006. ,
URL : https://hal.archives-ouvertes.fr/hal-00387116
Cutting planes for multistage stochastic integer programs, Operations research, vol.57, issue.2, pp.287-298, 2009. ,
Lot-sizing on a tree, Operations Research Letters, vol.36, issue.1, pp.7-13, 2008. ,
A branch-and-cut method for dynamic decision making under joint chance constraints, Management Science, vol.60, issue.5, pp.1317-1333, 2014. ,
The uncapacitated lot-sizing problem with sales and safety stocks, Mathematical Programming, vol.89, issue.3, pp.487-504, 2001. ,
Solution algorithms for dynamic lot-sizing in remanufacturing systems, International Journal of Production Research, vol.49, issue.22, pp.6729-6748, 2011. ,
Production planning by mixed integer programming, 2006. ,
Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach, International Journal of Production Research, vol.44, issue.5, pp.981-998, 2006. ,
Multi-item capacitated lot-sizing with demand uncertainty, International Journal of Production Research, vol.44, issue.15, pp.2997-3022, 2006. ,