O. Arnau, C. Molins, C. B. Blom, and J. C. Walraven, Longitudinal time-dependent response of segmental tunnel linings, Tunn Under Space Tech, vol.28, pp.98-108, 2012.

S. K. Au and J. L. Beck, Estimation of small failure probabilities in high dimensions by subset simulation, Probab Eng Mech, vol.16, pp.263-277, 2001.

S. K. Au, J. Ching, and J. L. Beck, Application of subset simulation methods to reliability benchmark problems, Struct Saf, vol.29, pp.183-193, 2007.

G. Barla, D. Debernardi, and D. Sterpi, Time-dependent modeling of tunnels in squeezing conditions, Int Jour Geomech, vol.12, pp.697-710, 2012.

A. J. Booth, A. M. Marshall, and R. Stace, Probabilistic analysis of a coal mine roadway including correlation control between model input parameters, Comput Geotech, vol.74, pp.151-162, 2016.

T. A. Bui, H. Wong, F. Deleruyelle, N. Dufour, C. Leo et al., Analytical modeling of a deep tunnel inside a poro-viscoplastic rock mass accounting for different stages of its life cycle, Comput Geotech, vol.58, pp.88-100, 2014.
URL : https://hal.archives-ouvertes.fr/hal-01844513

. Code_aster,

A. Fahimifar, F. M. Tehrani, A. Hedayat, and A. Vakilzadeh, Analytical solution for the excavation of circular tunnels in a visco-elastic Burger's material under hydrostatic stress field, Tunn Under Space Tech, vol.25, pp.297-304, 2010.

P. Fritz, An analytical solution for axisymmetric tunnel problems in elasto-viscoplastic media, Int Jour Num Anal Meth Geomech, vol.8, pp.325-342, 1984.

M. Gasc-barbier, S. Chanchole, and P. Bérest, Creep behavior of Bure clayed rock, App Clay Sci, vol.26, pp.449-458, 2004.

A. M. Hasofer and N. C. Lind, Exact and invariant second-moment code format, J Eng Mech Div, vol.100, pp.111-121, 1974.

J. C. Jaeger, N. Cook, and W. Zimmerman, Fundamentals of rock mechanics, 2007.

S. H. Jiang, D. Q. Li, L. M. Zhang, and C. B. Zhou, Time-dependent system reliability of anchored rock slopes considering rock bolt corrosion effect, Eng Geol, vol.175, pp.1-8, 2014.

E. Laso, M. Sagrario-gómez-lera, and E. Alarcón, A level II reliability approach to tunnel support design, Appl Math Model, vol.19, pp.371-382, 1995.

H. Z. Li and B. K. Low, Reliability analysis of circular tunnel under hydrostatic stress field, Comput Geotech, vol.37, pp.50-58, 2010.

B. K. Low, FORM, SORM and spatial modeling in geotechnical engineering, Struct Saf, vol.49, pp.56-64, 2014.

Q. Lü and B. K. Low, Probabilistic analysis of underground rock excavations using response surface method and SORM, Comput Geotech, vol.38, pp.1008-1021, 2011.

Q. Lü, C. L. Chan, and B. K. Low, System assessment for a rock tunnel with multiple failure modes, vol.46, pp.821-833, 2011.

D. P. Mason and H. Abelman, Support provided to rock excavations by a system of two liners, Int J Rock Mech Min Sci, vol.46, pp.1197-1205, 2009.

K. Miura, H. Yagi, H. Shiroma, and K. Takekuni, Study on design and construction method for the New Tomei-Meishin expressway tunnels, Tunn Under Space Tech, vol.18, pp.271-281, 2003.

G. Mollon, D. Dias, and A. H. Soubra, Probabilistic analysis of circular tunnels in homogeneous soil using response surface methodology, J Geotech Geoenviron Eng, vol.135, pp.1314-1325, 2009.
URL : https://hal.archives-ouvertes.fr/hal-01007210

P. Nomikos, R. Rahmannejad, and A. Sofianos, Supported axisymmetric tunnels within linear viscoelastic Burgers rocks, vol.44, pp.553-564, 2011.

Y. W. Pan and J. J. Dong, Time-dependent tunnel convergence-II. Advance rate and tunnel-support interaction, Int J Rock Mech Min Sci Geomech, vol.28, pp.477-488, 1991.

A. D. Polyanin and A. V. Manzhirov, Handbook of integral equations, p.147, 2008.

S. Sakurai, Approximate time-dependent analysis of tunnel support structure considering progress of tunnel face, Int J Num Anal Meth Geomech, vol.2, pp.159-175, 1978.

M. Sharifzadeh, R. Daraei, and M. S. Broojerdi, Design of sequential excavation tunneling in weak rocks through findings obtained from displacements based back analysis, Tunn Under Space Tech, vol.28, pp.10-17, 2012.

M. Sharifzadeh, A. Tarifard, A. Moridi, and M. , Time-dependent behavior of tunnel in weak rock mass based on displacement back analysis method, Tunn Under Space Tech, vol.38, pp.348-356, 2013.

F. Song, H. N. Wang, and M. J. Jiang, Analytical solutions for lined circular tunnels in viscoelastic rock considering various interface conditions, Appl Math Model, vol.55, pp.109-130, 2018.

J. Sulem, M. Panet, and A. Guenot, An analytical solution for timedependent displacement in a circular tunnel, Int J Rock Mech Min Sci Geomech, vol.24, pp.155-164, 1987.

H. Tran-manh, J. Sulem, D. Subrin, and D. Bilaux, Anisotropic timedependent modeling of tunnel excavation in squeezing ground, vol.48, pp.2301-2317, 2015.
URL : https://hal.archives-ouvertes.fr/hal-01254615

T. M. Vu, J. Sulem, D. Subrin, and N. Monin, Semi-analytical solution for stresses and displacement in a tunnel excavated in transversely isotropic formation with non-linear behavior, vol.46, pp.213-229, 2013.

Z. Wang and P. Wang, A nested extreme response surface approach for time-dependent reliability-based design optimization, J Mech Des, vol.134, pp.121007-121008, 2012.

H. N. Wang, Y. Li, Q. Ni, S. Utili, M. J. Jiang et al., Analytical solutions for the construction of the deeply buried circular tunnel with two liners in rheological rock, vol.46, pp.1481-1498, 2013.

H. N. Wang, S. Utili, and M. J. Jang, An analytical approach for the sequential excavation of axisymmetric lined tunnels in viscoelastic rock, Int J Rock Mech Min Sci, vol.68, pp.85-106, 2014.

D. Do,

C. L. Zhang, O. Czaikowski, and T. Rothfuchs, Thermo-hydromechanical behavior of the Collovo-Oxfordian clay rocks. GRS-226, 2010.

L. Zhang, Y. Liu, and Q. Yang, Study on time-dependent behavior and stability assessment of deep-buried tunnels based on internal state variable theory, Tunn Under Space Tech, vol.51, pp.164-174, 2016.

D. Zhang, X. Han, C. Jiang, J. Liu, and Q. Li, Time-dependent reliability analysis through response surface method, J Mech Des, vol.139, pp.41404-41405, 2017.