The SARAF-LINAC Project 2019 Status - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2019

The SARAF-LINAC Project 2019 Status

Résumé

SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC solenoid-Package have been tested recently. Meanwhile, the cryomodules technical specifications have been written and called for tender. This paper presents the status of the SARAF-LINAC Project at April 2019.
Fichier non déposé

Dates et versions

hal-02283600 , version 1 (11-09-2019)

Identifiants

Citer

Nicolas Pichoff, Dan Berkovits, Romuald Duperrier, Guillaume Ferrand, Bernard Gastineau, et al.. The SARAF-LINAC Project 2019 Status. 10th International Particle Accelerator Conference, May 2019, Melbourne, Australia. pp.THPTS116, ⟨10.18429/JACoW-IPAC2019-THPTS116⟩. ⟨hal-02283600⟩
48 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More