W. Ahmed, O. Hasan, and S. Tahar, Formalization of Reliability Block Diagrams in Higher-order Logic, Journal of Applied Logic, vol.18, pp.19-41, 2016.

,

A. , PATHOLOGIE : TOP 10, 2015.

F. Bistouni and M. Jahanshahi, Analyzing the reliability of shuffle-exchange networks using reliability block diagrams. Reliability Engineering and System Safety, vol.132, pp.97-106, 2014.

. Cerema, Perméabilité à l'air de l'enveloppe des bâtiments État des lieux du tertiaire en France -Octobre, pp.2012-2013, 2013.

Q. Chen, An Object Model Framework for Interface Management in Building Information Models, 2007.

L. Ding, H. Wang, J. Jiang, and A. Xu, SIL verification for SRS with diverse redundancy based on system degradation using reliability block diagram. Reliability Engineering and System Safety, vol.165, pp.170-187, 2017.

A. Esmaili, J. Li, J. Xie, and J. D. Isom, Closed-loop identification for plants under model predictive control, Control Engineering Practice, vol.72, pp.206-218, 2017.

Y. G. Gao, F. Y. Jiang, J. C. Song, L. J. Zheng, F. Y. Tian et al., A novel dual closed-loop control scheme based on repetitive control for grid-connected inverters with an LCL filter, ISA Transactions, pp.1-15, 2018.

C. Gobin, Analyse fonctionnelle et construction, vol.33, pp.0-16, 2012.

C. Gobin, Développement durable en BTP Fonctions d ' usage, vol.33, pp.0-12, 2012.

C. Gobin, Efficience d'une constructionContribution à un développement durable, vol.33, pp.0-12, 2012.

D. Jato-espino, E. Castillo-lopez, J. Rodriguez-hernandez, and J. C. Canteras-jordana, A review of application of multi-criteria decision making methods in construction, Automation in Construction, vol.45, pp.151-162, 2014.

,

J. Jin, L. Pang, S. Zhao, and B. Hu, Quantitative assessment of probability of failing safely for the safety instrumented system using reliability block diagram method, Annals of Nuclear Energy, vol.77, pp.30-34, 2015.

,

M. C. Kim, Reliability block diagram with general gates and its application to system reliability analysis, Annals of Nuclear Energy, vol.38, issue.11, pp.2456-2461, 2011.

S. K. Kim, H. S. Park, K. W. Lee, and C. H. Jung, Development of a digital mock-up system for selecting a decommissioning scenario, Annals of Nuclear Energy, vol.33, pp.1227-1235, 2006.

,

A. Lebert, S. Lasvaux, F. Grannec, S. Nibel, F. Achim et al., Capitalisation des résultats de l ' expérimentation HQE Performance, Analyse statistique Action, vol.22, pp.1-235, 2013.

P. E. Love, Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects, Journal of Construction Engineering and Management, vol.9364, p.128, 2002.

A. Mebarki, A. Resilience: theory and metrics -A metal structure as demonstrator, Eng. Struct, vol.138, pp.425-433, 2017.
URL : https://hal.archives-ouvertes.fr/hal-01166589

A. Mebarki, J. Barbosa, S. Prodhomme, G. Reimeringer, and M. , Natural hazards, vulnerability and structural resilience: tsunmais and industrial tanks, GNHR, vol.7, pp.5-17, 2016.
DOI : 10.1080/19475705.2016.1181458

URL : https://doi.org/10.1080/19475705.2016.1181458

A. Mebarki, M. Boukri, A. Laribi, M. N. Farsi, M. Belazougui et al., Seismic vulnerability: theory and application to Algerian buildings, JOSE, vol.18, pp.331-343, 2013.
DOI : 10.1007/s10950-013-9377-0

URL : https://hal.archives-ouvertes.fr/hal-00832252

A. Mébarki, N. Valencia, J. L. Salagnac, and B. Barroca, Flood hazards and masonry constructions: a probabilistic framework for damage, risks and resilience at urban scale, NHESS, vol.12, pp.1799-1809, 2012.

A. Mebarki, Safety of atmospheric industrial tanks: fragility, resilience and recovery functions, J. Loss Prev. Process Ind, vol.49, pp.590-602, 2017.
DOI : 10.1016/j.jlp.2017.06.007

URL : https://hal.archives-ouvertes.fr/hal-01534793

J. Nielsen, E. J. Hansen, and N. Aagaard, , 2009.

, Buildability As Tool, pp.1003-1012

R. Rajaram and B. Castellani, An entropy based measure for comparing distributions of complexity, Physica A: Statistical Mechanics and Its Applications, vol.453, pp.35-43, 2016.

L. Savage, The Foundations of Statistics, 1954.

H. A. Simon, The Ford distinguished lectures, 1960.

, The new science of management decision

V. Neumann, J. Morgenstern, and O. , Theory of Games and the Economic Behaviour (éd. SixtiethAnniversary Edition), 2004.

P. P. Wakker, Prospect Theory, 2010.

J. Wang, J. Su, Y. Zhao, and D. Zhou, Searching historical data segments for process identification in feedback control loops, Computers & Chemical Engineering, vol.112, pp.6-16, 2018.
DOI : 10.1016/j.compchemeng.2018.01.018

,

W. D. Yu and M. J. Skibniewski, , 1999.

, Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system, Automation in Construction, pp.105-113