I. Correia, L. L. Lourenço, S. Gama, and F. , Project scheduling with flexible resources: formulation and inequalities, OR spectrum, vol.34, issue.3, pp.635-663, 2012.

B. De-reyck and W. Herroelen, The multi-mode resource-constrained project scheduling problem with generalized precedence relations, European Journal of Operational Research, vol.119, issue.2, pp.538-556, 1999.

A. R. Kan, Machine scheduling problem: Classification , complexity and computations, 1976.

J. L. Kelley, I. Namioka, W. F. Donoghue, K. R. Lucas, B. Pettis et al.,

W. Scott and K. T. Smith, Linear topological spaces, 1963.

R. Klein, R. Kolisch, and A. Sprecher, {PSPLIB}-a project scheduling problem library: {OR} software-{ORSEP} operations research software exchange program, International Journal of Production Research, vol.38, issue.16, pp.170-171, 1997.

A. Laurent, L. Deroussi, N. Grangeon, N. , and S. , Multi-site rcpsp: Notations, mathematical model and resolution method, CIE45, International Conference on Computers & Industrial Engineering, 2015.

H. R. Lourenço, O. C. Martin, and T. Stützle, Iterated Local Search, pp.320-353, 2003.

N. Metropolis, A. W. Rosenbluth, M. N. Rosenbluth, A. H. Teller, and E. Teller, Equation of state calculations by fast computing machines, The journal of chemical physics, vol.21, issue.6, pp.1087-1092, 1953.

M. Mika, G. Waligora, J. ;. Weglarz, O. O?-guz, and H. Bala, A comparative study of computational procedures for the resource constrained project scheduling problem, Grid resource management, vol.72, pp.406-416, 1994.

M. Sabzehparvar and S. M. Seyed-hosseini, A mathematical model for the multi-mode resourceconstrained project scheduling problem with mode dependent time lags, The Journal of Supercomputing, vol.44, issue.3, pp.257-273, 2008.

H. Toussaint, Algorithmique rapide pour les probì emes de tournées et d'ordonnancement, 2010.