Challenges in Superconducting Accelerating Module Design and Construction for High Power Proton Accelerators - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2018

Challenges in Superconducting Accelerating Module Design and Construction for High Power Proton Accelerators

Résumé

CEA is engaged in the construction of the IFMIF, SARAF and ESS superconducting linacs and in particular in the design and production of a their accelerating cryomodules: 1 low-beta half-wave 176 MHz resonators for IFMIF, 4 low-beta half-wave 176 MHz resonators for SARAF and 30 medium and high-beta elliptical cavity resonators for ESS. The developments of these RF cryomodules, although at various stages, are led in parallel by the cryomodule team at CEA-Saclay, including all RF, mechanical, thermal, cryogenic, integration and QA-QC aspects in a global approach which attempts to optimise synergies and lessons learnt between these projects. A status report will be presented describing the common approaches and methods, and the systemic particularities of each project.
Fichier non déposé

Dates et versions

hal-02016881 , version 1 (13-02-2019)

Identifiants

Citer

Catherine Madec. Challenges in Superconducting Accelerating Module Design and Construction for High Power Proton Accelerators. 29th International Linear Accelerator Conference, Sep 2018, Beijing, China. pp.TU1A01, ⟨10.18429/JACoW-LINAC2018-TU1A01⟩. ⟨hal-02016881⟩
33 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More