H. Rohsler, A. Strand, J. I. Rosales, and F. Salamanca, Expérience relative aux systèmes à maintenance basée sur l'état des matériels, 1998.

H. Rohsler, R. Ruhle, M. Waeber, and A. Strand, Management-system for design, construction and mainenance in high-voltage networks, 2000.

T. Orlowska, G. Balzer, M. Halfmann, C. Neumann, and A. Strand, Life cycle management of circuit-breakers by application of reliability centered maintenance, 2000.

D. Kopejtkova, H. Ott, H. Rohsler, F. Salamanca, J. J. Smit et al., The multifunctional substation based on the novel assessment management, 1996.

S. Draber, E. Gelle, T. Kostic, O. Preiss, and U. Schluchter, How operation data helps manage lifecycle costs, 2000.

G. Balzer, O. Schmitt, A. Schneider, S. Gal, F. Balasiu et al., Life cycle assessment of substations: a procedure for an optimised asset management, 2002.

V. Biewendt, U. Christiansen, G. Friberg, F. Gallon, P. Kirchesch et al., Experiences with substation optimisation considering new technical and economical concepts, 2002.

P. Exit,