Beam Commissioning of the IFMIF EVEDA Very High Power RFQ

Enrico Fagotti
  • Fonction : Auteur
Loris Antoniazzi
  • Fonction : Auteur
Luca Bellan
  • Fonction : Auteur
Damiano Bortolato
  • Fonction : Auteur
Philippe Cara
  • Fonction : Auteur
Michele Comunian
  • Fonction : Auteur
Hervé Dzitko
  • Fonction : Auteur
Takashi Ebisawa
  • Fonction : Auteur
Alberto Facco
  • Fonction : Auteur
Dominique Gex
  • Fonction : Auteur
Mauro Giacchini
  • Fonction : Auteur
Francesco Grespan
  • Fonction : Auteur
Roland Heidinger
  • Fonction : Auteur
Antti Jokinen
  • Fonction : Auteur
Atsushi Kasugai
  • Fonction : Auteur
Keitaro Kondo
  • Fonction : Auteur
Alvaro Marqueta
  • Fonction : Auteur
Paolo Mereu
  • Fonction : Auteur
Maurizio Montis
  • Fonction : Auteur
Ivan Moya
  • Fonction : Auteur
Antonio Palmieri
  • Fonction : Auteur
Guy Phillips
  • Fonction : Auteur
Andrea Pisent
  • Fonction : Auteur
Giuseppe Pruneri
  • Fonction : Auteur
Keishi Sakamoto
  • Fonction : Auteur
Francesco Scantamburlo
  • Fonction : Auteur
Takahiro Shinya
  • Fonction : Auteur
Masayoshi Sugimoto
  • Fonction : Auteur
Moisés Weber
  • Fonction : Auteur

Résumé

IFMIF, the International Fusion Materials Irradiation Facility, is an accelerator-based neutron source that will use Li(d, xn) reactions to generate a flux of neutrons with a broad peak at 14 MeV equivalent to the conditions of the Deuterium-Tritium reactions in a fusion power plant. IFMIF is conceived for fusion materials testing. The IFMIF prototype linear accelerator (LIPAc) is jointly developed by Europe and Japan within the IFMIF EVEDA project: it is composed of an ion source, a LEBT, an RFQ, a MEBT and a SC linac, with a final energy of 9 MeV. The 4-vane Radio Frequency Quadrupole (RFQ), developed by INFN in Italy, will accelerate a 130 mA deuteron beam from 0.1 to 5 MeV in continuous wave, for a beam power of 650 kW. The 9.8 m long 175 MHz cavity is composed of 18 x 0.54 m long modules flanged together and aligned within 0.3 mm tolerance. The RFQ was completed, delivered and assembled at the Rokkasho site and is presently under extended RF tests. The second phase of beam commissioning (up to 2.5 MeV/u) was scheduled to start at the end of 2017. Several unexpected issues and incidents significantly delayed the original program, which is however proceeding step by step toward the full achievement of its goals.

Mots clés

Fichier non déposé

Dates et versions

hal-01876549 , version 1 (18-09-2018)

Identifiants

Citer

Enrico Fagotti, Loris Antoniazzi, Luca Bellan, Benoit Bolzon, Damiano Bortolato, et al.. Beam Commissioning of the IFMIF EVEDA Very High Power RFQ. 9th International Particle Accelerator Conference, Apr 2018, Vancouver, Canada. pp.THXGBF2, ⟨10.18429/JACoW-IPAC2018-THXGBF2⟩. ⟨hal-01876549⟩