The energy scheduling problem: Industrial case-study and constraint propagation techniques, International Journal of Production Economics, vol.143, issue.1, pp.13-23, 2013. ,
DOI : 10.1016/j.ijpe.2010.09.030
URL : https://hal.archives-ouvertes.fr/hal-00522387
Systematic literature review of decision support models for energy-efficient production planning, Computers & Industrial Engineering, vol.101, pp.243-259, 2016. ,
DOI : 10.1016/j.cie.2016.08.021
Computational Complexity of the Capacitated Lot Size Problem, Management Science, vol.28, issue.10, pp.1174-1186, 1982. ,
DOI : 10.1287/mnsc.28.10.1174
Single item lot sizing problems, European Journal of Operational Research, vol.168, issue.1, pp.1-16, 2006. ,
DOI : 10.1016/j.ejor.2004.01.054
URL : https://hal.archives-ouvertes.fr/hal-00468355
Single-item dynamic lot-sizing problems: An updated survey, European Journal of Operational Research, vol.263, issue.3, 2017. ,
DOI : 10.1016/j.ejor.2017.05.008
URL : https://hal.archives-ouvertes.fr/emse-01792227
Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches, IEEE Transactions on Automation Science and Engineering, vol.13, issue.2, pp.1138-1154, 2016. ,
DOI : 10.1109/TASE.2015.2495328
Deterministic Production Planning with Concave Costs and Capacity Constraints, Theory Series, pp.12-20, 1971. ,
DOI : 10.1287/mnsc.18.1.12
Deterministic Production Planning: Algorithms and Complexity, Management Science, vol.26, issue.7, pp.669-679, 1980. ,
DOI : 10.1287/mnsc.26.7.669
Energy-efficient scheduling in manufacturing companies: A review and research framework, European Journal of Operational Research, vol.248, issue.3, pp.744-757, 2016. ,
DOI : 10.1016/j.ejor.2015.07.017
Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems, Journal of Cleaner Production, vol.148, pp.624-641, 2017. ,
DOI : 10.1016/j.jclepro.2017.01.166
The Dynamic Lot-Sizing Problem with Startup and Reservation Costs, Operations Research, vol.35, issue.3, pp.389-398, 1987. ,
DOI : 10.1287/opre.35.3.389
Lot-sizing in a multi-stage flow line production system with energy consideration, International Journal of Production Research, vol.55, issue.6, pp.1640-1663, 2017. ,
DOI : 10.1080/00207543.2014.931608
Energy management in manufacturing: From literature review to a conceptual framework, Journal of Cleaner Production, vol.167, pp.1464-1489, 2017. ,
DOI : 10.1016/j.jclepro.2016.10.191
Algorithms for robust production scheduling with energy consumption limits, Computers & Industrial Engineering, vol.112, pp.391-408, 2017. ,
DOI : 10.1016/j.cie.2017.08.011
A hybrid exact method for a scheduling problem with a continuous resource and energy constraints, Constraints, vol.208, issue.1, pp.304-324, 2015. ,
DOI : 10.1016/j.ejor.2010.03.037
URL : https://hal.archives-ouvertes.fr/hal-02136670
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions, OR Spectrum, vol.208, issue.3, pp.459-492, 2016. ,
DOI : 10.1016/j.ejor.2010.03.037
URL : https://hal.archives-ouvertes.fr/hal-01234466
Scheduling under a non-reversible energy source: An application of piecewise linear bounding of non-linear demand/cost functions, Discrete Applied Mathematics, vol.208, issue.58, pp.98-113, 1999. ,
DOI : 10.1016/j.dam.2016.03.001
, Production Planning by Mixed Integer Programming, 2006.
Capacity acquisition for the single-item lot sizing problem under energy constraints. To appear in Omega, 2018. ,
URL : https://hal.archives-ouvertes.fr/hal-01617045
Integrated pulp and paper mill planning and scheduling, Computers & Industrial Engineering, vol.63, issue.1, pp.1-12, 2012. ,
DOI : 10.1016/j.cie.2012.01.008
An Approach for Energy-oriented Production Control Using Energy Flexibility, Procedia CIRP, vol.29, pp.197-202, 2015. ,
DOI : 10.1016/j.procir.2015.02.038
Energy management in industry ??? a systematic review of previous findings and an integrative conceptual framework, Journal of Cleaner Production, vol.112, pp.3692-3708, 2016. ,
DOI : 10.1016/j.jclepro.2015.06.060
A stochastic production planning problem with nonlinear cost, Computers & Operations Research, vol.39, issue.9, pp.1977-1987, 2012. ,
DOI : 10.1016/j.cor.2011.09.007
A mathematical modeling approach to energy cost saving in a manufacturing plant, 2004. ,
Dynamic Version of the Economic Lot Size Model, Management Science, vol.5, issue.1, pp.89-96, 1958. ,
DOI : 10.1287/mnsc.5.1.89
Including energy in supply chain planning at a pulp company, Applied Energy, vol.112, pp.1056-1065, 2013. ,
DOI : 10.1016/j.apenergy.2012.12.032
Production planning optimization of an ethylene plant considering process operation and energy utilization, Computers & Chemical Engineering, vol.87, pp.1-12, 2016. ,
DOI : 10.1016/j.compchemeng.2016.01.002