C. Artigues, P. Lopez, and A. Ha¨?tha¨?t, The energy scheduling problem: Industrial case-study and constraint propagation techniques, International Journal of Production Economics, vol.143, issue.1, pp.13-23, 2013.
DOI : 10.1016/j.ijpe.2010.09.030

URL : https://hal.archives-ouvertes.fr/hal-00522387

K. Biel and C. H. Glock, Systematic literature review of decision support models for energy-efficient production planning, Computers & Industrial Engineering, vol.101, pp.243-259, 2016.
DOI : 10.1016/j.cie.2016.08.021

G. R. Bitran and H. H. Yanasse, Computational Complexity of the Capacitated Lot Size Problem, Management Science, vol.28, issue.10, pp.1174-1186, 1982.
DOI : 10.1287/mnsc.28.10.1174

N. Brahimi, S. Dauzère-pérès, N. M. Najid, and A. Nordli, Single item lot sizing problems, European Journal of Operational Research, vol.168, issue.1, pp.1-16, 2006.
DOI : 10.1016/j.ejor.2004.01.054

URL : https://hal.archives-ouvertes.fr/hal-00468355

N. Brahimi, N. Absi, S. Dauzère-pérès, and A. Nordli, Single-item dynamic lot-sizing problems: An updated survey, European Journal of Operational Research, vol.263, issue.3, 2017.
DOI : 10.1016/j.ejor.2017.05.008

URL : https://hal.archives-ouvertes.fr/emse-01792227

J. Ding, S. Song, R. Zhang, R. Chiong, and C. Wu, Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches, IEEE Transactions on Automation Science and Engineering, vol.13, issue.2, pp.1138-1154, 2016.
DOI : 10.1109/TASE.2015.2495328

M. Florian and M. Klein, Deterministic Production Planning with Concave Costs and Capacity Constraints, Theory Series, pp.12-20, 1971.
DOI : 10.1287/mnsc.18.1.12

M. Florian, J. K. Lenstra, R. Kan, and A. H. , Deterministic Production Planning: Algorithms and Complexity, Management Science, vol.26, issue.7, pp.669-679, 1980.
DOI : 10.1287/mnsc.26.7.669

C. Gahm, F. Denz, M. Dirr, and A. Tuma, Energy-efficient scheduling in manufacturing companies: A review and research framework, European Journal of Operational Research, vol.248, issue.3, pp.744-757, 2016.
DOI : 10.1016/j.ejor.2015.07.017

D. Giglio, M. Paolucci, and A. Roshani, Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems, Journal of Cleaner Production, vol.148, pp.624-641, 2017.
DOI : 10.1016/j.jclepro.2017.01.166

U. Karmarkar, S. Kekre, and S. Kekre, The Dynamic Lot-Sizing Problem with Startup and Reservation Costs, Operations Research, vol.35, issue.3, pp.389-398, 1987.
DOI : 10.1287/opre.35.3.389

O. Masmoudi, A. Yalaoui, Y. Ouazene, and H. Chehade, Lot-sizing in a multi-stage flow line production system with energy consideration, International Journal of Production Research, vol.55, issue.6, pp.1640-1663, 2017.
DOI : 10.1080/00207543.2014.931608

G. May, B. Stahl, M. Taisch, and D. Kiritsis, Energy management in manufacturing: From literature review to a conceptual framework, Journal of Cleaner Production, vol.167, pp.1464-1489, 2017.
DOI : 10.1016/j.jclepro.2016.10.191

I. Modos, P. Sucha, and Z. Hanzalek, Algorithms for robust production scheduling with energy consumption limits, Computers & Industrial Engineering, vol.112, pp.391-408, 2017.
DOI : 10.1016/j.cie.2017.08.011

M. Nattaf, C. Artigues, and P. Lopez, A hybrid exact method for a scheduling problem with a continuous resource and energy constraints, Constraints, vol.208, issue.1, pp.304-324, 2015.
DOI : 10.1016/j.ejor.2010.03.037

URL : https://hal.archives-ouvertes.fr/hal-02136670

M. Nattaf, C. Artigues, P. Lopez, and D. Rivreau, Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions, OR Spectrum, vol.208, issue.3, pp.459-492, 2016.
DOI : 10.1016/j.ejor.2010.03.037

URL : https://hal.archives-ouvertes.fr/hal-01234466

S. U. Ngueveu, C. Artigues, and P. Lopez, Scheduling under a non-reversible energy source: An application of piecewise linear bounding of non-linear demand/cost functions, Discrete Applied Mathematics, vol.208, issue.58, pp.98-113, 1999.
DOI : 10.1016/j.dam.2016.03.001

Y. Pochet and L. A. Wolsey, Production Planning by Mixed Integer Programming, 2006.

C. Rapine, B. Penz, C. Gicquel, and A. Akbalik, Capacity acquisition for the single-item lot sizing problem under energy constraints. To appear in Omega, 2018.
URL : https://hal.archives-ouvertes.fr/hal-01617045

M. O. Santos and B. Almada-lobo, Integrated pulp and paper mill planning and scheduling, Computers & Industrial Engineering, vol.63, issue.1, pp.1-12, 2012.
DOI : 10.1016/j.cie.2012.01.008

C. Schultz, P. Sellmaier, and G. Reinhart, An Approach for Energy-oriented Production Control Using Energy Flexibility, Procedia CIRP, vol.29, pp.197-202, 2015.
DOI : 10.1016/j.procir.2015.02.038

M. Schulze, H. Nehler, M. Ottosson, and P. Thollander, Energy management in industry ??? a systematic review of previous findings and an integrative conceptual framework, Journal of Cleaner Production, vol.112, pp.3692-3708, 2016.
DOI : 10.1016/j.jclepro.2015.06.060

L. Tang, P. Che, and J. Liu, A stochastic production planning problem with nonlinear cost, Computers & Operations Research, vol.39, issue.9, pp.1977-1987, 2012.
DOI : 10.1016/j.cor.2011.09.007

E. Uzel, A mathematical modeling approach to energy cost saving in a manufacturing plant, 2004.

H. M. Wagner and T. M. Whitin, Dynamic Version of the Economic Lot Size Model, Management Science, vol.5, issue.1, pp.89-96, 1958.
DOI : 10.1287/mnsc.5.1.89

M. Waldemarsson, H. Lidestam, and M. Rudberg, Including energy in supply chain planning at a pulp company, Applied Energy, vol.112, pp.1056-1065, 2013.
DOI : 10.1016/j.apenergy.2012.12.032

H. Zhao, M. G. Ierapetritou, and G. Rong, Production planning optimization of an ethylene plant considering process operation and energy utilization, Computers & Chemical Engineering, vol.87, pp.1-12, 2016.
DOI : 10.1016/j.compchemeng.2016.01.002