M. A. Aloulou, A. Dolgui, and M. Y. Kovalyov, A bibliography of non-deterministic lotsizing models, International Journal of Production Research, vol.52, issue.8, pp.1-18, 2014.
URL : https://hal.archives-ouvertes.fr/emse-00881465

Y. Arda and J. Hennet, Inventory control in a multi-supplier system, International Journal of Production Economics, vol.104, issue.2, pp.249-259, 2006.
DOI : 10.1016/j.ijpe.2004.09.008

Z. Atan, T. De-kok, N. Dellaert, R. Van-boxel, and F. Janssen, Setting planned lead-times in customerorder-driven assembly systems, Manufacturing & Service Operations Management, pp.122-140, 2016.
DOI : 10.1287/msom.2015.0565

D. Bandaly, A. Satir, and L. Shanker, Impact of lead time variability in supply chain risk management, International Journal of Production Economics, vol.180, pp.88-100, 2016.
DOI : 10.1016/j.ijpe.2016.07.014

T. Berlec, E. Govekar, J. Grum, P. Potocnik, and M. Starbek, Predicting order lead times, Journal of Mechanical Engineering, vol.54, issue.5, pp.308-321, 2008.

R. Bollapragada, S. Kuppusamy, and U. S. Rao, Component procurement and end product assembly in an uncertain supply and demand environment, International Journal of Production Research, vol.22, issue.3, pp.969-982, 2015.
DOI : 10.1080/00207541003690074

V. Borodin, A. Dolgui, F. Hnaien, and N. Labadie, Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach, International Journal of Production Economics, vol.181, pp.79-86, 2016.
DOI : 10.1016/j.ijpe.2016.02.017

URL : https://hal.archives-ouvertes.fr/hal-01313213

C. Chandra and J. Grabis, Inventory management with variable lead-time dependent procurement cost, Omega, vol.36, issue.5, pp.877-87, 2008.
DOI : 10.1016/j.omega.2006.04.009

C. Chu, J. Proth, and X. Xie, Supply management in assembly systems, Naval Research Logistics, vol.7, issue.7, pp.933-949, 1993.
DOI : 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO;2-8

URL : https://hal.archives-ouvertes.fr/inria-00074937

D. Damand, R. Derrouiche, and B. M. , Parameterisation of the MRP method: automatic identification and extraction of properties, International Journal of Production Research, vol.16, issue.4, pp.5658-5669, 2013.
DOI : 10.1080/095372800110052511

M. Díaz-madroñero, J. Mula, and D. Peidro, A review of discrete-time optimization models for tactical production planning, International Journal of Production Research, vol.57, issue.3, pp.5171-5205, 2014.
DOI : 10.1016/j.cie.2007.10.013

H. Ding, L. Benyoucef, and X. Xie, A simulation optimization methodology for supplier selection problem, International Journal of Computer Integrated Manufacturing, vol.18, issue.2-3, pp.2-3, 2005.
DOI : 10.1080/0951192052000288161

URL : https://hal.archives-ouvertes.fr/emse-00449389

A. Dolgui, A model of joint control of reserves in automatic control systems of production. Automation and Remote Control, pp.2020-2026, 2002.
URL : https://hal.archives-ouvertes.fr/emse-00704697

A. Dolgui, B. Ammar, O. Hnaien, F. , O. Louly et al., A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty, Studies in Informatics and Control, pp.255-268, 2013.
DOI : 10.24846/v22i3y201302

URL : https://hal.archives-ouvertes.fr/emse-00877836

A. Dolgui, O. Louly, M. A. , and H. F. , Supply planning for single-level assembly system with stochastic component delivery times and service level constraints, International Journal of Production Economics, vol.115, issue.1, pp.236-247, 2008.

A. Dolgui, M. Portmann, and P. , Planification de syst??mes d'assemblage avec approvisionnements al??atoires en composants, Journal of Decision Systems, vol.24, issue.4, pp.255-278, 1995.
DOI : 10.1002/1520-6750(199203)39:2<265::AID-NAV3220390209>3.0.CO;2-L

A. Dolgui and C. Prodhon, Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007.
DOI : 10.1016/j.arcontrol.2007.02.007

URL : https://hal.archives-ouvertes.fr/emse-00675845

M. Elhafsi, Optimal leadtimes planning in serial production systems with earliness and tardiness costs, IIE Transactions, vol.34, issue.3, pp.233-243, 2002.
DOI : 10.1287/mnsc.33.1.95

S. Fallah-jamshidi, N. Karimi, and M. Zandieh, A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications, vol.38, issue.11, pp.13549-13554, 2011.
DOI : 10.1016/j.eswa.2011.04.065

R. Farhani, S. Rezapour, T. Drezner, and S. Fallah, Competitive supply chain network design: an overview of classifications, models, solution techniques and applications, Omega, pp.45-92, 2014.

P. Fiala, Information sharing in supply chains, Omega, vol.33, issue.5, pp.419-423, 2005.
DOI : 10.1016/j.omega.2004.07.006

B. B. Flynn, X. Koufteros, and G. Lu, On Theory in Supply Chain Uncertainty and its Implications for Supply Chain Integration, Journal of Supply Chain Management, vol.29, issue.2, pp.3-27, 2016.
DOI : 10.1016/j.jom.2010.04.004

R. Golini and M. Kalchschmidt, Moderating the impact of global sourcing on inventories through supply chain management, International Journal of Production Economics, vol.133, issue.1, pp.86-94, 2011.
DOI : 10.1016/j.ijpe.2010.06.011

V. Guide and R. Srivastava, A review of techniques for buffering against uncertainty with MRP systems, Production Planning & Control, vol.11, issue.3, pp.223-233, 2000.
DOI : 10.1080/095372800232199

F. Hnaien, X. Delorme, and A. Dolgui, Genetic algorithm for supply planning in two-level assembly systems with random lead times, Engineering Applications of Artificial Intelligence, vol.22, issue.6, pp.906-915, 2008.
DOI : 10.1016/j.engappai.2008.10.012

URL : https://hal.archives-ouvertes.fr/emse-00710397

F. Hnaien, A. Dolgui, and M. Ould-louly, Planned lead time optimization in material requirement planning environment for multilevel production systems, Journal of Systems Science and Systems Engineering, vol.19, issue.4, pp.132-155, 2008.
DOI : 10.1080/12460125.1995.10511659

F. Hnaien, A. Dolgui, and D. D. Wu, Single-period inventory model for one-level assembly system with stochastic lead times and demand, International Journal of Production Research, vol.4, issue.3, pp.186-203, 2016.
DOI : 10.1080/07408178708975409

URL : https://hal.archives-ouvertes.fr/emse-01184876

M. Jansen, T. Kok, and J. Fransoo, Lead time anticipation in Supply Chain Operations Planning, OR Spectrum, vol.163, issue.3, pp.251-290, 2013.
DOI : 10.1016/j.ejor.2004.03.001

H. Kellerer, U. Pferschy, and D. Pisinger, Knapsack Problems, 2004.
DOI : 10.1007/978-3-540-24777-7

P. R. Kleindorfer and G. H. Saad, Managing Disruption Risks in Supply Chains, Production and Operations Management, vol.15, issue.2, pp.53-68, 2005.
DOI : 10.1111/j.1937-5956.2005.tb00010.x

M. Ko, A. Tiwari, and J. Mehnen, A review of soft computing applications in supply chain management, Applied Soft Computing, vol.10, issue.3, pp.661-674, 2010.
DOI : 10.1016/j.asoc.2009.09.004

S. Koh, S. Saad, and M. Jones, Uncertainty under MRP-planned manufacture: Review and categorization, International Journal of Production Research, vol.28, issue.10, pp.2399-2421, 2002.
DOI : 10.1108/01443579810192916

H. Kuang, S. J. Hu, and J. Ko, A dynamic programming approach to integrated assembly planning and supplier assignment with lead time constraints, International Journal of Production Research, vol.8, issue.9, pp.2691-2708, 2016.
DOI : 10.1109/21.31045

S. Martello and P. Toth, Knapsack problems: algorithms and computer implementations, 1990.

B. I. May, M. P. Atkinson, and G. Ferrer, Applying inventory classification to a large inventory management system, Journal of Operations and Supply Chain Management, vol.10, issue.1, pp.68-86, 2017.
DOI : 10.12660/joscmv10n1p68-86

E. Mohebbi and F. Choobineh, The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty, Omega, vol.33, issue.6, pp.472-482, 2005.
DOI : 10.1016/j.omega.2004.07.011

J. Mula, R. Poler, J. Garcia-sabater, and F. Lario, Models for production planning under uncertainty: A review, International Journal of Production Economics, vol.103, issue.1, pp.271-285, 2006.
DOI : 10.1016/j.ijpe.2005.09.001

O. Louly, M. Dolgui, and A. , Generalized newsboy model to compute the optimal planned lead times in assembly systems, International Journal of Production Research, vol.21, issue.17, pp.4401-4414, 2002.
DOI : 10.1080/002075499190383

URL : https://hal.archives-ouvertes.fr/emse-00704620

O. Louly, M. Dolgui, A. And-hnaien, and F. , Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, vol.19, issue.19, pp.5441-5467, 2008.
DOI : 10.1002/nav.3800330419

URL : https://hal.archives-ouvertes.fr/hal-00387671

O. Louly, M. Dolgui, and A. , Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm, European Journal of Operational Research, vol.199, issue.3, pp.723-731, 2009.
DOI : 10.1016/j.ejor.2007.11.066

URL : https://hal.archives-ouvertes.fr/emse-00676016

D. Peidro, J. Mula, R. Poler, and L. , Quantitative models for supply chain planning under uncertainty: a review, The International Journal of Advanced Manufacturing Technology, vol.176, issue.1, pp.400-420, 2009.
DOI : 10.1016/S0305-0548(03)00235-1

D. Petrovica, R. Roy, and R. Petrovic, Modelling and simulation of a supply chain in an uncertain environment, European Journal of Operational Research, vol.109, issue.2, pp.299-309, 1998.
DOI : 10.1016/S0377-2217(98)00058-7

E. Revilla and M. J. Sáenz, Supply chain disruption management: Global convergence vs national specificity, Journal of Business Research, vol.67, issue.6, pp.1123-1135, 2014.
DOI : 10.1016/j.jbusres.2013.05.021

S. H. Shojaie, A. Bahoosh, and M. Pourhassan, A Study on MRP with Using Leads Time, Order Quality and Service Level over a Single Inventory, Journal UMP Social Sciences and Technology Management, vol.3, issue.1, pp.235-239, 2015.

E. Simangunsong, L. Hendry, and M. Stevenson, Supply-chain uncertainty: a review and theoretical foundation for future research, International Journal of Production Research, vol.3, issue.3, pp.4493-4523, 2012.
DOI : 10.1108/13598540010347307

URL : https://hal.archives-ouvertes.fr/hal-00740351

J. Song, C. Yano, and P. Lerssrisuriya, Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing Service Operation Management, pp.287-296, 2000.

C. Speier, J. M. Whipple, D. J. Closs, and M. D. Voss, Global supply chain design considerations: Mitigating product safety and security risks, Journal of Operations Management, vol.29, issue.7-8, pp.721-736, 2011.
DOI : 10.1016/j.jom.2011.06.003

L. V. Snyder, Z. Atan, P. Peng, Y. Rong, A. J. Schmitt et al., OR/MS models for supply chain disruptions: a review, IIE Transactions, vol.35, issue.2, pp.89-109, 2016.
DOI : 10.1016/j.omega.2008.05.006

O. Tang and R. Grubbström, The detailed coordination problem in a two-level assembly system with stochastic lead times, International Journal of Production Economics, vol.81, issue.82, pp.81-82, 2003.
DOI : 10.1016/S0925-5273(02)00296-7

D. Trietsch, Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result, International Journal of Production Research, vol.25, issue.4, pp.627-637, 2006.
DOI : 10.1080/07408178708975409

J. Van-kampen-tim, P. Van-donk-dirk, and D. Van-der-zee, Safety stock or safety lead time: coping with unreliability in demand and supply, International Journal of Production Research, vol.22, issue.24, pp.23-24, 2010.
DOI : 10.1080/002075400188528

M. Wazed, A. Shamsuddin, and N. Yusoff, Uncertainty factors in real manufacturing environment, Australian Journal of Basic and Applied Sciences, vol.3, issue.2, pp.342-351, 2009.

C. A. Yano, Stochastic Leadtimes in Two-Level Assembly Systems, IIE Transactions, vol.19, issue.4, pp.371-378, 1987.
DOI : 10.1287/mnsc.33.1.95

C. A. Yano, Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs, Management Science, vol.33, issue.1, pp.95-106, 1987.
DOI : 10.1287/mnsc.33.1.95

C. A. Yano, Planned Leadtimes For Serial Production Systems, IIE Transactions, vol.19, issue.3, pp.300-307, 1987.
DOI : 10.1287/mnsc.33.1.95

S. H. Yoo, H. Shin, and P. , New product development and the effect of supplier involvement, Omega, vol.51, pp.107-120, 2015.
DOI : 10.1016/j.omega.2014.09.005