A bibliography of non-deterministic lotsizing models, International Journal of Production Research, vol.52, issue.8, pp.1-18, 2014. ,
URL : https://hal.archives-ouvertes.fr/emse-00881465
Inventory control in a multi-supplier system, International Journal of Production Economics, vol.104, issue.2, pp.249-259, 2006. ,
DOI : 10.1016/j.ijpe.2004.09.008
Setting planned lead-times in customerorder-driven assembly systems, Manufacturing & Service Operations Management, pp.122-140, 2016. ,
DOI : 10.1287/msom.2015.0565
Impact of lead time variability in supply chain risk management, International Journal of Production Economics, vol.180, pp.88-100, 2016. ,
DOI : 10.1016/j.ijpe.2016.07.014
Predicting order lead times, Journal of Mechanical Engineering, vol.54, issue.5, pp.308-321, 2008. ,
Component procurement and end product assembly in an uncertain supply and demand environment, International Journal of Production Research, vol.22, issue.3, pp.969-982, 2015. ,
DOI : 10.1080/00207541003690074
Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach, International Journal of Production Economics, vol.181, pp.79-86, 2016. ,
DOI : 10.1016/j.ijpe.2016.02.017
URL : https://hal.archives-ouvertes.fr/hal-01313213
Inventory management with variable lead-time dependent procurement cost, Omega, vol.36, issue.5, pp.877-87, 2008. ,
DOI : 10.1016/j.omega.2006.04.009
Supply management in assembly systems, Naval Research Logistics, vol.7, issue.7, pp.933-949, 1993. ,
DOI : 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO;2-8
URL : https://hal.archives-ouvertes.fr/inria-00074937
Parameterisation of the MRP method: automatic identification and extraction of properties, International Journal of Production Research, vol.16, issue.4, pp.5658-5669, 2013. ,
DOI : 10.1080/095372800110052511
A review of discrete-time optimization models for tactical production planning, International Journal of Production Research, vol.57, issue.3, pp.5171-5205, 2014. ,
DOI : 10.1016/j.cie.2007.10.013
A simulation optimization methodology for supplier selection problem, International Journal of Computer Integrated Manufacturing, vol.18, issue.2-3, pp.2-3, 2005. ,
DOI : 10.1080/0951192052000288161
URL : https://hal.archives-ouvertes.fr/emse-00449389
A model of joint control of reserves in automatic control systems of production. Automation and Remote Control, pp.2020-2026, 2002. ,
URL : https://hal.archives-ouvertes.fr/emse-00704697
A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty, Studies in Informatics and Control, pp.255-268, 2013. ,
DOI : 10.24846/v22i3y201302
URL : https://hal.archives-ouvertes.fr/emse-00877836
Supply planning for single-level assembly system with stochastic component delivery times and service level constraints, International Journal of Production Economics, vol.115, issue.1, pp.236-247, 2008. ,
Planification de syst??mes d'assemblage avec approvisionnements al??atoires en composants, Journal of Decision Systems, vol.24, issue.4, pp.255-278, 1995. ,
DOI : 10.1002/1520-6750(199203)39:2<265::AID-NAV3220390209>3.0.CO;2-L
Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007. ,
DOI : 10.1016/j.arcontrol.2007.02.007
URL : https://hal.archives-ouvertes.fr/emse-00675845
Optimal leadtimes planning in serial production systems with earliness and tardiness costs, IIE Transactions, vol.34, issue.3, pp.233-243, 2002. ,
DOI : 10.1287/mnsc.33.1.95
A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications, vol.38, issue.11, pp.13549-13554, 2011. ,
DOI : 10.1016/j.eswa.2011.04.065
Competitive supply chain network design: an overview of classifications, models, solution techniques and applications, Omega, pp.45-92, 2014. ,
Information sharing in supply chains, Omega, vol.33, issue.5, pp.419-423, 2005. ,
DOI : 10.1016/j.omega.2004.07.006
On Theory in Supply Chain Uncertainty and its Implications for Supply Chain Integration, Journal of Supply Chain Management, vol.29, issue.2, pp.3-27, 2016. ,
DOI : 10.1016/j.jom.2010.04.004
Moderating the impact of global sourcing on inventories through supply chain management, International Journal of Production Economics, vol.133, issue.1, pp.86-94, 2011. ,
DOI : 10.1016/j.ijpe.2010.06.011
A review of techniques for buffering against uncertainty with MRP systems, Production Planning & Control, vol.11, issue.3, pp.223-233, 2000. ,
DOI : 10.1080/095372800232199
Genetic algorithm for supply planning in two-level assembly systems with random lead times, Engineering Applications of Artificial Intelligence, vol.22, issue.6, pp.906-915, 2008. ,
DOI : 10.1016/j.engappai.2008.10.012
URL : https://hal.archives-ouvertes.fr/emse-00710397
Planned lead time optimization in material requirement planning environment for multilevel production systems, Journal of Systems Science and Systems Engineering, vol.19, issue.4, pp.132-155, 2008. ,
DOI : 10.1080/12460125.1995.10511659
Single-period inventory model for one-level assembly system with stochastic lead times and demand, International Journal of Production Research, vol.4, issue.3, pp.186-203, 2016. ,
DOI : 10.1080/07408178708975409
URL : https://hal.archives-ouvertes.fr/emse-01184876
Lead time anticipation in Supply Chain Operations Planning, OR Spectrum, vol.163, issue.3, pp.251-290, 2013. ,
DOI : 10.1016/j.ejor.2004.03.001
Knapsack Problems, 2004. ,
DOI : 10.1007/978-3-540-24777-7
Managing Disruption Risks in Supply Chains, Production and Operations Management, vol.15, issue.2, pp.53-68, 2005. ,
DOI : 10.1111/j.1937-5956.2005.tb00010.x
A review of soft computing applications in supply chain management, Applied Soft Computing, vol.10, issue.3, pp.661-674, 2010. ,
DOI : 10.1016/j.asoc.2009.09.004
Uncertainty under MRP-planned manufacture: Review and categorization, International Journal of Production Research, vol.28, issue.10, pp.2399-2421, 2002. ,
DOI : 10.1108/01443579810192916
A dynamic programming approach to integrated assembly planning and supplier assignment with lead time constraints, International Journal of Production Research, vol.8, issue.9, pp.2691-2708, 2016. ,
DOI : 10.1109/21.31045
Knapsack problems: algorithms and computer implementations, 1990. ,
Applying inventory classification to a large inventory management system, Journal of Operations and Supply Chain Management, vol.10, issue.1, pp.68-86, 2017. ,
DOI : 10.12660/joscmv10n1p68-86
The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty, Omega, vol.33, issue.6, pp.472-482, 2005. ,
DOI : 10.1016/j.omega.2004.07.011
Models for production planning under uncertainty: A review, International Journal of Production Economics, vol.103, issue.1, pp.271-285, 2006. ,
DOI : 10.1016/j.ijpe.2005.09.001
Generalized newsboy model to compute the optimal planned lead times in assembly systems, International Journal of Production Research, vol.21, issue.17, pp.4401-4414, 2002. ,
DOI : 10.1080/002075499190383
URL : https://hal.archives-ouvertes.fr/emse-00704620
Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, vol.19, issue.19, pp.5441-5467, 2008. ,
DOI : 10.1002/nav.3800330419
URL : https://hal.archives-ouvertes.fr/hal-00387671
Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm, European Journal of Operational Research, vol.199, issue.3, pp.723-731, 2009. ,
DOI : 10.1016/j.ejor.2007.11.066
URL : https://hal.archives-ouvertes.fr/emse-00676016
Quantitative models for supply chain planning under uncertainty: a review, The International Journal of Advanced Manufacturing Technology, vol.176, issue.1, pp.400-420, 2009. ,
DOI : 10.1016/S0305-0548(03)00235-1
Modelling and simulation of a supply chain in an uncertain environment, European Journal of Operational Research, vol.109, issue.2, pp.299-309, 1998. ,
DOI : 10.1016/S0377-2217(98)00058-7
Supply chain disruption management: Global convergence vs national specificity, Journal of Business Research, vol.67, issue.6, pp.1123-1135, 2014. ,
DOI : 10.1016/j.jbusres.2013.05.021
A Study on MRP with Using Leads Time, Order Quality and Service Level over a Single Inventory, Journal UMP Social Sciences and Technology Management, vol.3, issue.1, pp.235-239, 2015. ,
Supply-chain uncertainty: a review and theoretical foundation for future research, International Journal of Production Research, vol.3, issue.3, pp.4493-4523, 2012. ,
DOI : 10.1108/13598540010347307
URL : https://hal.archives-ouvertes.fr/hal-00740351
Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing Service Operation Management, pp.287-296, 2000. ,
Global supply chain design considerations: Mitigating product safety and security risks, Journal of Operations Management, vol.29, issue.7-8, pp.721-736, 2011. ,
DOI : 10.1016/j.jom.2011.06.003
OR/MS models for supply chain disruptions: a review, IIE Transactions, vol.35, issue.2, pp.89-109, 2016. ,
DOI : 10.1016/j.omega.2008.05.006
The detailed coordination problem in a two-level assembly system with stochastic lead times, International Journal of Production Economics, vol.81, issue.82, pp.81-82, 2003. ,
DOI : 10.1016/S0925-5273(02)00296-7
Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result, International Journal of Production Research, vol.25, issue.4, pp.627-637, 2006. ,
DOI : 10.1080/07408178708975409
Safety stock or safety lead time: coping with unreliability in demand and supply, International Journal of Production Research, vol.22, issue.24, pp.23-24, 2010. ,
DOI : 10.1080/002075400188528
Uncertainty factors in real manufacturing environment, Australian Journal of Basic and Applied Sciences, vol.3, issue.2, pp.342-351, 2009. ,
Stochastic Leadtimes in Two-Level Assembly Systems, IIE Transactions, vol.19, issue.4, pp.371-378, 1987. ,
DOI : 10.1287/mnsc.33.1.95
Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs, Management Science, vol.33, issue.1, pp.95-106, 1987. ,
DOI : 10.1287/mnsc.33.1.95
Planned Leadtimes For Serial Production Systems, IIE Transactions, vol.19, issue.3, pp.300-307, 1987. ,
DOI : 10.1287/mnsc.33.1.95
New product development and the effect of supplier involvement, Omega, vol.51, pp.107-120, 2015. ,
DOI : 10.1016/j.omega.2014.09.005