Maintenance decision model for steel bridges - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue Structure and Infrastructure Engineering Année : 2017

Maintenance decision model for steel bridges

Un modèle décisionnel de maintenance pour les ouvrages d'art d'acier

Résumé

A probabilistic model is developed to investigate the crack growth development in welded details of orthotropic bridge decks. Bridge decks may contain many of these vulnerable details and bridge reliability cannot always be guaranteed upon the attainment of a critical crack. Therefore insight into the crack growth development is crucial in guaranteeing bridge reliability and scheduling efficient maintenance schemes. The probabilistic nature of the crack growth development model and the dependence of this model on many interdependent random variables results in significant uncertainties regarding model outcome. To reduce some of these uncertainties the probabilistic model is combined with a monitoring system installed on a part of the bridge. In addition, a Bayesian network is used to determine the dependence structure between the different details (monitored and non-monitored) of the bridge. This dependence structure enables us to make more accurate crack growth predictions for all details of the bridge while monitoring only a limited number of those details and updating the remaining uncertainties.
Fichier principal
Vignette du fichier
MDMSB.pdf (1.38 Mo) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-01517056 , version 1 (02-05-2017)

Identifiants

Citer

Thomas Attema, Alex Kosgodagan Acharige, Oswaldo Morales-Nápoles, Johan Maljaars. Maintenance decision model for steel bridges: A case in the Netherlands. Structure and Infrastructure Engineering, 2017, 13 (2), pp.242 - 253. ⟨10.1080/15732479.2016.1158194⟩. ⟨hal-01517056⟩
272 Consultations
124 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More