. Abb, Abb robotstudio picking powerpac simplifies the design and programming of complex robotic pick-and-pack systems, 2014.

M. Bonert, L. H. Shu, and B. Benhabib, Motion planning for multirobot assembly systems, International Journal of Computer Integrated Manufacturing, vol.13, issue.4, pp.301-310, 2010.

H. I. Bozma and M. E. Kalalioglu, Multirobot coordination in pick-andplace tasks on a moving conveyor, Robotics and Computer-Integrated Manufacturing, vol.28, pp.530-538, 2012.

Y. Edan, S. Berman, E. Boteach, and E. Mendelson, Distributed multirobot assembly-packaging algorithms. Intelligent Automation and Soft Computing, vol.10, pp.349-357, 2004.

H. Fujimoto, I. Tanigawa, K. Yasuda, and K. Iwahashi, Applications of genetic algorithm and simulation to dispatching rule-based fms scheduling, Proceedings 1995 IEEE International Conference on Robotics and Automation, vol.1, pp.190-195, 1995.

F. Herzog, Method and apparatus for filling containers with piece goods, 2003.

K. Hindle and M. Duffin, Simul8-planner for composites manufacturing, Proceedings of the Winter Simulation Conference, 2006. WSC 06, pp.1779-1784, 2006.

G. Humbert, M. T. Pham, X. Brun, M. Guillemot, and D. Noterman, Comparative analysis of pick & place strategies for a multi-robot application, 20th IEEE International Conference on Emerging Technologies and Factory Automation ETFA 2015, 2015.
URL : https://hal.archives-ouvertes.fr/hal-01225223

T. Izumi, K. Koyanagi, K. Matsukuma, and Y. Hashiguchi, Robot system, Patent EP, vol.2, pp.586-576, 2013.

N. A. Johari, H. Haron, and A. S. Jaya, Robotic modeling and simulation of palletizer robot using workspace5, 4th International Conference on Computer Graphics, Imaging and Visualization (CGIV 2007), pp.217-222, 2007.

. Keba, Real world simulation package, 2014.

R. Mattone, L. Adduci, and A. Wolf, Online scheduling algorithms for improving performance of pick-and-place operations on a moving conveyor belt, Proceedings of the IEEE International Conference on Robotics and Automation, ICRA-98, vol.3, pp.2099-2105, 1998.

E. Mendelson, O. Nayer, S. Berman, and Y. Edan, Behavior-based control of multi-robot assembly palletizing systems, Proceedings of the 5th Biannual World Automation Congress, vol.14, pp.1-6, 2002.

S. A. Mirzapourrezaei, M. Lalmazloumian, A. Dargi, and K. Wong, Simulation of a manufacturing assembly line based on witness, Third International Conference on Computational Intelligence, Communication Systems and Networks (CICSyN), pp.132-137, 2011.

A. Nikakhtar, . Kuan-yew, M. H. Wong, A. Zarei, and . Memari, Comparison of two simulation software for modeling a construction process, Third International Conference on Computational Intelligence, Modelling and Simulation (CIMSiM), pp.200-205, 2011.

C. D. Pegden and D. T. Sturrock, Introduction to simio, Simulation Conference (WSC), Proceedings of the 2009 Winter, pp.314-321, 2009.

H. Sahin, Design of a secondary packaging robotic system, 2005.

R. Sam, K. Arrifin, and N. Buniyamin, Simulation of pick and place robotics system using solidworks softmotion, International Conference on System Engineering and Technology (ICSET), pp.1-6, 2012.

D. Slim, C. Hicham, Y. Farouk, and A. Lionel, Efficient metaheuristics for pick and place robotic systems optimization, Journal of Intelligent Manufacturing, vol.25, pp.27-41, 2014.

. Staubli, , 2013.

D. Wappling and S. Murphy, Pick and place, 2012.

G. Yasuda, An object-oriented multitasking control environment for multirobot system programming and execution with 3d graphic simulation, In International Journal of Production Economics, vol.60, pp.241-250, 1999.

G. Yasuda, Implementation of distributed control architecture for multiple robot systems using petri nets, Petri Nets -Manufacturing and Computer Science, Dr. Pawel Pawlewski, pp.75-94, 2012.

M. Zhou and M. Leu, Petri net modeling of a flexible assembly station for printed circuit boards, Proceeding IEEE International Conference on Robotics and Automation, vol.3, pp.2530-2535, 1991.