T. Aven, Foundations of Risk Analysis, 2003.

T. Aven, Some reflections on uncertainty analysis and management. Reliability Engineering and System Safety, pp.195-201, 2010.

T. Aven, Misconceptions of Risk, 2010.
DOI : 10.1002/9780470686539

T. Aven and H. B. , Reliability and validity of risk analysis. Reliability Engineering and method, The Second International Conference on Algorithmic Decision Theory,Algorithmic Decision Theory, ADT 2011, LNAI 6992, pp.219-233, 2011.

C. Charu, C. Chen, and H. Jiawei, The Inverse Classification Problem, JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY, vol.25, issue.3, pp.458-468, 2010.

C. Aggarwal, C. Chen, and H. Jiawei, On the Inverse Classification Problem and its Applications, 22nd International Conference on Data Engineering (ICDE'06), 2006.
DOI : 10.1109/ICDE.2006.109

L. Aiguo, Z. Xin, and Z. Jiulong, Performance Analysis of Quantitative Attributes Inverse Classification Problem, JOURNAL OF COMPUTERS, vol.7, issue.5, 2012.

T. Aven and R. Flage, Use of decision criteria based on expected values to support decision-making in a production assurance and safety setting, Reliability Engineering & System Safety, vol.94, issue.9, pp.1491-1498, 2009.
DOI : 10.1016/j.ress.2009.02.007

M. Hofmann, G. Kjølle, and O. Gjerde, Development of indicators to monitor vulnerabilities in power systems, 2012 International Conference on Probabilistic Safety Assessment and Management (PSAM 11) & European Safety and RELiability Conference, 2012.

B. Roy, The outranking approach and the foundations of electre methods, Theory and Decision, vol.24, issue.4, pp.49-73, 1991.
DOI : 10.1007/BF00134132

V. Mousseau and R. Slowinski, Inferring an ELECTRE TRI Model from Assignment Examples, Journal of Global Optimization, vol.12, issue.2, pp.157-174, 1998.
DOI : 10.1023/A:1008210427517

T. Wang, V. Mousseau, N. Pedroni, and E. Zio, Assessing the confidence of a classificationbased vulnerability analysis model, Risk Analysis, 2014.

A. Saltelli, M. Ratto, T. Andres, F. Campolongo, J. Carboni et al., Global sensitivity analysis. The primer, 2008.
DOI : 10.1002/9780470725184

C. Rocco and E. Zio, Bootstrap-based techiniques for computing confidence intervals in monte carlo system reliability evaluation, Reliability and Maintainability Symposium, 2005. Proceedings. Annual. Page(s), pp.303-307

G. Levitin, K. Hausken, B. Haim, and H. , Defending majority voting systems against a strategic attacker, Reliability Engineering & System Safety, vol.111, issue.1, pp.37-44, 2013.
DOI : 10.1016/j.ress.2012.10.004

S. A. Thekdi and J. H. Lambert, Quantification of Scenarios and Stakeholders Influencing Priorities for Risk Mitigation in Infrastructure Systems, Journal of Management in Engineering, vol.30, issue.1, pp.32-40, 2014.
DOI : 10.1061/(ASCE)ME.1943-5479.0000170

C. W. Karvetski and J. H. Lambert, Evaluating deep uncertainties in strategic priority-setting with an application to facility energy investments, Systems Engineering, vol.14, issue.1, pp.483-493, 2012.
DOI : 10.1002/sys.21215

L. J. Martinez, J. H. Lambert, and C. Karvetski, Scenario-informed multiple criteria analysis for prioritizing investments in electricity capacity expansion. Reliability Engineering and System Safety, pp.883-891, 2011.

M. C. Hamilton, J. H. Lambert, J. W. Keisler, I. Linkov, and F. M. Holcomb, Research and Development Priorities for Energy Islanding of Military and Industrial Installations, Journal of Infrastructure Systems, vol.19, issue.3, pp.297-305, 2013.
DOI : 10.1061/(ASCE)IS.1943-555X.0000133

E. C. Rogerson and J. H. Lambert, Prioritizing risk via several expert perspectives with application to airport runway safety. Reliability Engineering and System Safety, pp.22-34, 2012.

N. N. Joshi and J. H. Lambert, Diversification of engineering infrastructure investments for emergent and unknown non-systematic risks, Journal of Risk Research, vol.14, issue.4, pp.1466-4461, 2011.