A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2015

A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine

Résumé

Simultaneously scheduling jobs and preventive maintenance is a topical subject in the scheduling literature. In this paper, we study a two-machine flow-shop makespan scheduling problem with a deteriorating maintenance period on the second machine, that is, delaying the maintenance increases the time required to perform it.We show that the studied problem is NP-hard and we establish some conditions of the optimal schedule. We also develop a branch and bound (B&B) algorithm to solve this problem. Numerical experiments show that the B&B method can solve large-size instances.
Fichier non déposé

Dates et versions

hal-01222686 , version 1 (30-10-2015)

Identifiants

Citer

Ahmed Gara-Ali, Marie-Laure Espinouse. A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine. IESM 2015 - International Conference on Industrial Engineering and Systems Management, University of Seville, Oct 2015, Séville, Spain. pp.481 - 488, ⟨10.1109/IESM.2015.7380202⟩. ⟨hal-01222686⟩
68 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More