Gas Production in the MEGAPIE Spallation Target - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue Nuclear Science and Engineering Année : 2011

Gas Production in the MEGAPIE Spallation Target

Résumé

The MEGAwatt PIlot Experiment (MEGAPIE) project was started in 2000 to design, build, and operate a liquid lead-bismuth eutectic (LBE) spallation neutron target at the power level of 1 MW. The target was irradiated for 4 months in 2006 at the Paul Scherrer Institute in Switzerland. Gas samples wereextracted in various phases of operation and analyzed by g spectroscopy, leading to the determination of the main radioactive isotopes released from the LBE. Comparison with calculations performed using several validated codes (MCNPX2.5.0/CINDER’90, FLUKA/ORIHET, and SNT) yields the ratio between simulated in-target isotope production rates and experimental amounts released at any given time. This work underlines the weak points of spallation models for some released isotopes. Also, results provide relevant information for safety and radioprotection in an accelerator-driven system and more particularly for the gas management in a spallation target dedicated to neutron production facilities.
Fichier principal
Vignette du fichier
2011_Nuclear_Science_and_Engineering_MEGAPIE.pdf (373.56 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)

Dates et versions

hal-01082307 , version 1 (19-11-2014)

Identifiants

  • HAL Id : hal-01082307 , version 1

Citer

Nicolas Thiollière, Luca Zanini, Jean-Christophe David, Jost Eikenberg, Arnaud Guertin, et al.. Gas Production in the MEGAPIE Spallation Target. Nuclear Science and Engineering, 2011, 169, pp.178-187. ⟨hal-01082307⟩
124 Consultations
7 Téléchargements

Partager

Gmail Facebook X LinkedIn More