A Preliminary Integrated Model for Optimizing Tactical Production Planning and Condition-Based Maintenance - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2011

A Preliminary Integrated Model for Optimizing Tactical Production Planning and Condition-Based Maintenance

Résumé

The inclusion of production and maintenance objectives in an overall decision-making approach remains as well an academic challenge as a response to a real industrial need. Based on the observation of mutual dependence between production planning and the stochastic variability of the system production performance due to degradation, we propose in this paper a strategy for optimizing both tactical production planning and maintenance under feasibility constraint. The strategy is driven by an iterative two-unit algorithm. The first unit performs the Master Production Schedule optimization whereas the second unit provides an estimation of the feasibility indicators via a stochastic simulation-based approach. Mathematical framework and the proposed iterative algorithm are directly integrated in friendly-user interface software for optimizing the methodology usability in an industrial context.
Fichier non déposé

Dates et versions

hal-00860348 , version 1 (10-09-2013)

Identifiants

  • HAL Id : hal-00860348 , version 1

Citer

Bruno Castanier, David Lemoine. A Preliminary Integrated Model for Optimizing Tactical Production Planning and Condition-Based Maintenance. Industrial Engineering and Systems Management - IESM 2011, May 2011, Metz, France. pp.998-1007. ⟨hal-00860348⟩
183 Consultations
0 Téléchargements

Partager

Gmail Facebook X LinkedIn More