Skip to Main content Skip to Navigation
Journal articles

Optimal predictive control of water transport systems: Arrêt-Darré/Arros case study

Abstract : This paper proposes the use of predictive optimal control as a suitable methodology to manage efficiently transport water networks. The predictive optimal controller is implemented using MPC control techniques. The Arrêt-Darré/Arros dam-river system located in the Southwest region of France is proposed as case study. A high-fidelity dynamic simulator based on the full Saint-Venant equations and able to reproduce this system is developed in MATLAB/SIMULINK to validate the performance of the developed predictive optimal control system. The control objective in the Arrêt-Darré/Arros dam-river system is to guarantee an ecological flow rate at a control point downstream of the Arrêt-Darré dam by controlling the outflow of this dam in spite of the unmeasured disturbances introduced by rainfalls incomings and farmer withdrawals.
Document type :
Journal articles
Complete list of metadatas

Cited literature [18 references]  Display  Hide  Download

https://hal.archives-ouvertes.fr/hal-00854454
Contributor : Open Archive Toulouse Archive Ouverte (oatao) <>
Submitted on : Tuesday, August 27, 2013 - 11:47:04 AM
Last modification on : Saturday, December 8, 2018 - 8:48:02 AM
Long-term archiving on: : Thursday, April 6, 2017 - 9:16:38 AM

File

Chiron_6629.pdf
Files produced by the author(s)

Identifiers

Collections

Citation

Vicenc Puig, Juli Romera, Joseba Quevedo, Claudia Cardona, Antonio Salterain, et al.. Optimal predictive control of water transport systems: Arrêt-Darré/Arros case study. Water Science and Technology, IWA Publishing, 2009, vol. 60, pp. 2125-2133. ⟨10.2166/wst.2009.525⟩. ⟨hal-00854454⟩

Share

Metrics

Record views

382

Files downloads

1705