I. Assayad, A. Girault, and H. Kalla, A bi-criteria scheduling heuristic for distributed embedded systems under reliability and real-time constraints, International Conference on Dependable Systems and Networks, 2004, pp.347-356, 2004.
DOI : 10.1109/DSN.2004.1311904

A. Avizienis, J. Laprie, B. Randell, and C. Landwehr, Basic concepts and taxonomy of dependable and secure computing, IEEE Transactions on Dependable and Secure Computing, vol.1, issue.1
DOI : 10.1109/TDSC.2004.2

H. S. Balaban, Some effects of redundancy on system reliability, National Symposium on Reliability and Quality Control, pp.385-402, 1960.

M. O. Ball, Computational Complexity of Network Reliability Analysis: An Overview, IEEE Transactions on Reliability, vol.35, issue.3, pp.230-239, 1986.
DOI : 10.1109/TR.1986.4335422

A. Colin and I. Puaut, Worst case execution time analysis for a processor with branch prediction. Real-Time Syst, pp.249-274, 2000.

A. Dogan and F. Ozgünerozg¨ozgüner, Matching and scheduling algorithms for minimizing execution time and failure probability of applications in heterogeneous computing, IEEE Transactions on Parallel and Distributed Systems, vol.13, issue.3, pp.308-323, 2002.
DOI : 10.1109/71.993209

A. Dogan and F. Ozgünerozg¨ozgüner, Biobjective Scheduling Algorithms for Execution Time-Reliability Trade-off in Heterogeneous Computing Systems, The Computer Journal, vol.48, issue.3, pp.300-314, 2005.
DOI : 10.1093/comjnl/bxh086

J. Dongara, E. Jeannot, E. Saule, and Z. Shi, Bi-objective scheduling algorithms for optimizing makespan and reliability on heterogeneous systems, Proceedings of the nineteenth annual ACM symposium on Parallel algorithms and architectures , SPAA '07, pp.280-288, 2007.
DOI : 10.1145/1248377.1248423

C. Ferdinand, R. Heckmann, M. Langenbach, F. Martin, M. Schmidt et al., Reliable and Precise WCET Determination for a Real-Life Processor, International Workshop on Embedded Software, EMSOFT'01, 2001.
DOI : 10.1007/3-540-45449-7_32

J. Gauthier, X. Leduc, and A. Rauzy, Assessment of large automatically generated fault trees by means of binary decision diagrams, J. of Risk and Reliability, vol.221, issue.2, pp.95-105, 2007.

T. Grandpierre, C. Lavarenne, and Y. Sorel, Optimized rapid prototyping for real-time embedded heterogeneous multiprocessors, Proceedings of the seventh international workshop on Hardware/software codesign , CODES '99, 1999.
DOI : 10.1145/301177.301489

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.42.3154

M. Hakem and F. Butelle, A bi-objective algorithm for scheduling parallel applications on heterogeneous systems subject to failures, Rencontres Francophones du Parallélisme, RENPAR'06, 2006.
URL : https://hal.archives-ouvertes.fr/hal-00148583

C. Hirel, R. Sahner, X. Zang, and K. S. Trivedi, Reliability and performability modeling using Sharpe, International Conference on Computer Performance Evaluation: Modelling Techniques and Tools, TOOLS'00, pp.345-349, 2000.
DOI : 10.1007/3-540-46429-8_28

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.91.1445

C. Hsieh and Y. Hsieh, Reliability and cost optimization in distributed computing systems, Computers & Operations Research, vol.30, issue.8, pp.1103-1119, 2003.
DOI : 10.1016/S0305-0548(02)00058-8

M. A. Iverson, Dynamic Mapping and Scheduling Algorithms for a Multi-User Heterogeneous Computing Environement An algorithm to determine the reliability of a complex system, IEEE Trans. Reliability, vol.18, pp.169-174, 1969.

S. Kartik and C. S. Murthy, Improved task-allocation algorithms to maximize reliability of redundant distributed computing systems, IEEE Transactions on Reliability, vol.44, issue.4, pp.575-586, 1995.
DOI : 10.1109/24.475976

J. C. Knight and N. G. Leveson, An experimental evaluation of the assumption of independence in multi-version programming, IEEE Trans. Software Engin, vol.12, issue.1, pp.96-109, 1986.

D. Lloyd and M. Lipow, Reliability, 1962.
DOI : 10.1201/9781420017656.ch7

P. Pop, K. Poulsen, and V. Izosimov, Scheduling and voltage scaling for energy/reliability trade-offs in fault-tolerant timetriggered embedded systems, CODES-ISSS'07, 2007.

X. Qin and H. Jiang, A novel fault-tolerant scheduling algorithm for precedence constrained tasks in real-time heterogeneous systems, Parallel Computing, vol.32, issue.5-6, pp.5-6331, 2006.
DOI : 10.1016/j.parco.2006.06.006

S. M. Shatz and J. Wang, Models and algorithms for reliability-oriented task-allocation in redundant distributed-computer systems, IEEE Transactions on Reliability, vol.38, issue.1, pp.16-26, 1989.
DOI : 10.1109/24.24570

G. C. Sih and E. A. Lee, A compile-time scheduling heuristic for interconnection constraint heterogeneous processor architectures

J. Souyris, E. L. Pavec, G. Himbert, V. Jégu, G. Borios et al., Computing the worst case execution time of an avionics program by abstract interpretation, International Workshop on Worst-case Execution Time, WCET'05, pp.21-24, 2005.

H. Theiling, C. Ferdinand, and R. Wilhelm, Fast and precise WCET prediction by separate cache and path analyses. Real-Time Syst, pp.157-179, 2000.

V. T. 'kindt and J. Billaut, Multicriteria Scheduling: Theory, Models and Algorithms, 2006.
URL : https://hal.archives-ouvertes.fr/hal-01067335

D. Zhu, R. Melhem, and D. Mossé, The effects of energy management on reliability in real-time embedded systems, International Conference on Computer Aided Design, ICCAD'04, pp.35-40, 2004.