A Comparison of Strategies to Dampen Nervousness in MRP Systems, Management Science, vol.32, issue.4, pp.413-429, 1986. ,
DOI : 10.1287/mnsc.32.4.413
Single item lot sizing problems, European Journal of Operational Research, vol.168, issue.1, pp.1-16, 2006. ,
DOI : 10.1016/j.ejor.2004.01.054
URL : https://hal.archives-ouvertes.fr/hal-00468355
Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach, Management Science, vol.25, issue.8, pp.754-761, 1979. ,
DOI : 10.1287/mnsc.25.8.754
Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007. ,
DOI : 10.1016/j.arcontrol.2007.02.007
URL : https://hal.archives-ouvertes.fr/emse-00675845
Approche méthodologique pour l'intégration des systèmes contrôlés par le produit dans un environnement de juste-à-temps, Thèse de doctorat, 2008. ,
Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research, Interfaces, vol.15, issue.6, pp.3-14, 1985. ,
DOI : 10.1287/inte.15.6.3
Nervousness in inventory control: Analytical results, OR Spektrum, vol.25, issue.31, pp.113-123, 1994. ,
DOI : 10.1007/BF01719468
Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty, Journal of Operations Management, vol.13, issue.3, pp.193-211, 1995. ,
DOI : 10.1016/0272-6963(95)00023-L
New lot-sizing formulations for less nervous production schedules, Computers & Operations Research, vol.27, issue.13, pp.1325-1345, 2000. ,
DOI : 10.1016/S0305-0548(99)00076-3
Master Production Rescheduling Policy in Capacity-Constrained Just-In-Time Make-To-Stock Environments, Decision Sciences, vol.25, issue.2, pp.365-387, 1996. ,
DOI : 10.1016/0272-6963(93)90022-H
Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing, Omega, vol.26, issue.3, pp.355-366, 1998. ,
DOI : 10.1016/S0305-0483(97)00056-X
Le kanban actif pour assurer l'interopérabilité décisionnelle centralisé/distribué, Thèse de doctorat, 2008. ,
The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study, International Journal of Production Economics, vol.95, issue.1, pp.95-107, 2005. ,
DOI : 10.1016/j.ijpe.2003.11.010
Proposition d'un environnement de modélisation et de test d'architectures de pilotage par le produit de systèmes de production, Thèse de doctorat, 2007. ,
The performance of product-driven manufacturing control: An emulation-based benchmarking study, Computers in Industry, vol.60, issue.3, pp.195-203, 2009. ,
DOI : 10.1016/j.compind.2008.12.007
URL : https://hal.archives-ouvertes.fr/hal-00341877
Production planning by mixed integer programming, 2006. ,
Single item lot-sizing with non-decreasing capacities, 2008. ,
Dynamic rescheduling that simultaneously considers efficiency and stability, Computers & Industrial Engineering, vol.46, issue.1, pp.1-15, 2004. ,
DOI : 10.1016/j.cie.2003.09.007
Agent System Application in High-Volume Production Management, Boston, S., éditeur. Emerging Solutions for Future Manufacturing Systems, pp.193-200, 2005. ,
DOI : 10.1007/0-387-22829-2_20
Remanufacturing planning for the reverse Wagner/Whitin models, European Journal of Operational Research, vol.121, issue.2, pp.304-315, 2000. ,
DOI : 10.1016/S0377-2217(99)00219-2
MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS, Decision Sciences, vol.17, issue.3, pp.147-166, 1988. ,
DOI : 10.1016/0272-6963(82)90028-6
Planning and replanning the master production schedule under demand uncertainty, International Journal of Production Economics, vol.78, issue.3, pp.323-334, 2002. ,
DOI : 10.1016/S0925-5273(00)00100-6
Mathematical Programming Approaches for Stable Tactical and Operational Planning in Supply Chain and APS Context, Journal of Decision Systems, vol.34, issue.9, pp.425-455, 2008. ,
DOI : 10.1016/0272-6963(93)90022-H
URL : https://hal.archives-ouvertes.fr/hal-00325681
The impact of material coordination concepts on planning stability in supply chains, International Journal of Production Economics, vol.68, issue.2, pp.169-176, 2000. ,
DOI : 10.1016/S0925-5273(00)00033-5
Impact of forecasting error on the performance of capacitated multi-item production systems, Computers & Industrial Engineering, vol.46, issue.2, pp.205-219, 2004. ,
DOI : 10.1016/j.cie.2003.12.020
Freezing the master production schedule under single resource constraint and demand uncertainty, International Journal of Production Economics, vol.83, issue.1, pp.65-84, 2003. ,
DOI : 10.1016/S0925-5273(02)00262-1
Lot-sizing rules and freezing the master production schedule in material requirements planning systems, International Journal of Production Economics, vol.53, issue.3, pp.281-305, 1997. ,
DOI : 10.1016/S0925-5273(97)00111-4