J. Blackburn, D. Kropp, and R. Et-millen, A Comparison of Strategies to Dampen Nervousness in MRP Systems, Management Science, vol.32, issue.4, pp.413-429, 1986.
DOI : 10.1287/mnsc.32.4.413

N. Brahimi, S. Dauzère-pérès, N. Najid, and A. Et-nordli, Single item lot sizing problems, European Journal of Operational Research, vol.168, issue.1, pp.1-16, 2006.
DOI : 10.1016/j.ejor.2004.01.054

URL : https://hal.archives-ouvertes.fr/hal-00468355

R. Carlson, J. Jucker, and D. Et-kroop, Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach, Management Science, vol.25, issue.8, pp.754-761, 1979.
DOI : 10.1287/mnsc.25.8.754

A. Dolgui and C. Et-prodhon, Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007.
DOI : 10.1016/j.arcontrol.2007.02.007

URL : https://hal.archives-ouvertes.fr/emse-00675845

H. Elhaouzi, Approche méthodologique pour l'intégration des systèmes contrôlés par le produit dans un environnement de juste-à-temps, Thèse de doctorat, 2008.

R. Hayes and K. Clark, Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research, Interfaces, vol.15, issue.6, pp.3-14, 1985.
DOI : 10.1287/inte.15.6.3

K. Inderfurth, Nervousness in inventory control: Analytical results, OR Spektrum, vol.25, issue.31, pp.113-123, 1994.
DOI : 10.1007/BF01719468

S. Kadipasaoglu and V. Et-sridharan, Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty, Journal of Operations Management, vol.13, issue.3, pp.193-211, 1995.
DOI : 10.1016/0272-6963(95)00023-L

O. Kazan, R. Nagi, and C. Et-rump, New lot-sizing formulations for less nervous production schedules, Computers & Operations Research, vol.27, issue.13, pp.1325-1345, 2000.
DOI : 10.1016/S0305-0548(99)00076-3

G. Kern and J. Et-wei, Master Production Rescheduling Policy in Capacity-Constrained Just-In-Time Make-To-Stock Environments, Decision Sciences, vol.25, issue.2, pp.365-387, 1996.
DOI : 10.1016/0272-6963(93)90022-H

A. Kimms, Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing, Omega, vol.26, issue.3, pp.355-366, 1998.
DOI : 10.1016/S0305-0483(97)00056-X

T. Klein, Le kanban actif pour assurer l'interopérabilité décisionnelle centralisé/distribué, Thèse de doctorat, 2008.

M. Meixell, The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study, International Journal of Production Economics, vol.95, issue.1, pp.95-107, 2005.
DOI : 10.1016/j.ijpe.2003.11.010

R. Pannequin, Proposition d'un environnement de modélisation et de test d'architectures de pilotage par le produit de systèmes de production, Thèse de doctorat, 2007.

R. Pannequin, G. Morel, and A. Thomas, The performance of product-driven manufacturing control: An emulation-based benchmarking study, Computers in Industry, vol.60, issue.3, pp.195-203, 2009.
DOI : 10.1016/j.compind.2008.12.007

URL : https://hal.archives-ouvertes.fr/hal-00341877

Y. Pochet and L. Et-wolsey, Production planning by mixed integer programming, 2006.

Y. Pochet and L. Et-wolsey, Single item lot-sizing with non-decreasing capacities, 2008.

R. Rangsaritratsamee, W. F. Jr, and M. B. Et-kurz, Dynamic rescheduling that simultaneously considers efficiency and stability, Computers & Industrial Engineering, vol.46, issue.1, pp.1-15, 2004.
DOI : 10.1016/j.cie.2003.09.007

M. Rehák, P. Chervát, and M. Et-p?chou?ek, Agent System Application in High-Volume Production Management, Boston, S., éditeur. Emerging Solutions for Future Manufacturing Systems, pp.193-200, 2005.
DOI : 10.1007/0-387-22829-2_20

K. Richter and M. Et-sombrutzki, Remanufacturing planning for the reverse Wagner/Whitin models, European Journal of Operational Research, vol.121, issue.2, pp.304-315, 2000.
DOI : 10.1016/S0377-2217(99)00219-2

S. Sridharan, W. Berry, and V. Et-udayabhanu, MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS, Decision Sciences, vol.17, issue.3, pp.147-166, 1988.
DOI : 10.1016/0272-6963(82)90028-6

O. Tang and R. Et-grubbström, Planning and replanning the master production schedule under demand uncertainty, International Journal of Production Economics, vol.78, issue.3, pp.323-334, 2002.
DOI : 10.1016/S0925-5273(00)00100-6

A. Thomas, P. Genin, and S. Et-lamouri, Mathematical Programming Approaches for Stable Tactical and Operational Planning in Supply Chain and APS Context, Journal of Decision Systems, vol.34, issue.9, pp.425-455, 2008.
DOI : 10.1016/0272-6963(93)90022-H

URL : https://hal.archives-ouvertes.fr/hal-00325681

K. Van-donselaar, J. Van-den-nieuwenhof, and J. Et-visschers, The impact of material coordination concepts on planning stability in supply chains, International Journal of Production Economics, vol.68, issue.2, pp.169-176, 2000.
DOI : 10.1016/S0925-5273(00)00033-5

J. Xie, T. Lee, and X. Et-zhao, Impact of forecasting error on the performance of capacitated multi-item production systems, Computers & Industrial Engineering, vol.46, issue.2, pp.205-219, 2004.
DOI : 10.1016/j.cie.2003.12.020

J. Xie, X. Zhao, and T. Et-lee, Freezing the master production schedule under single resource constraint and demand uncertainty, International Journal of Production Economics, vol.83, issue.1, pp.65-84, 2003.
DOI : 10.1016/S0925-5273(02)00262-1

X. Zhao and K. Et-lam, Lot-sizing rules and freezing the master production schedule in material requirements planning systems, International Journal of Production Economics, vol.53, issue.3, pp.281-305, 1997.
DOI : 10.1016/S0925-5273(97)00111-4