W. Abdul-kader, Simulation of an Unreliable Production Line, Journal of Decision Systems, vol.13, issue.1, pp.31-46, 2003.
DOI : 10.1016/0377-2217(95)00313-4

C. Chandra and A. Kamrani, Mass Customization: A Supply Chain Approach, 2004.
DOI : 10.1007/978-1-4419-9015-0

M. Christopher, The Agile Supply Chain, Industrial Marketing Management, vol.29, issue.1, pp.37-44, 2000.
DOI : 10.1016/S0019-8501(99)00110-8

E. Haouzi, H. Pannequin, R. Thomas, and A. , Génération automatique de plateformes de simulation pour des systèmes organisés en flux tirés, 7e Congrès International de Génie Industriel, pp.5-8, 2007.

R. M. Fujimoto, Time Management in The High Level Architecture, SIMULATION, vol.71, issue.6, pp.388-400, 1998.
DOI : 10.1177/003754979807100604

J. W. Fowler and O. Rose, Grand Challenges in Modeling and Simulation of Complex Manufacturing Systems, SIMULATION, vol.80, issue.9, pp.469-476, 2004.
DOI : 10.1177/0037549704044324

N. Giambiasi, B. Escude, and S. Ghosh, G-DEVS A Generalized Discrete Event Specification for Accurate Modeling of Dynamic Systems, Transactions of the SCS International, vol.17, issue.3, pp.120-134, 2000.

V. Giard and G. Mendy, De l'approvisionnement synchrone ?? la production synchrone dans la cha??ne logistique, Revue fran??aise de gestion, vol.33, issue.171, pp.65-88, 2007.
DOI : 10.3166/rfg.171.65-88

F. Gilbreth and L. Gilbreth, Time and Motion Study as Fundamental Factors in Planning and Control, 1921.

R. Mason-jones and D. R. Towill, Using the Information Decoupling Point to Improve Supply Chain Performance, The International Journal of Logistics Management, vol.10, issue.2, pp.13-26, 1999.
DOI : 10.1108/09574099910805969

K. Miyashita, T. Okazaki, and H. Matsuo, Simulation-Based Advanced WIP Management and Control in Semiconductor Manufacturing, Proceedings of the 2004 Winter Simulation Conference, 2004., pp.5-8, 2004.
DOI : 10.1109/WSC.2004.1371553

F. Ounnar, P. Pujo, L. Mekaouche, and N. Giambiasi, Integration of a flat holonic form in an HLA environment, Journal of Intelligent Manufacturing, vol.24, issue.1, pp.91-111, 2009.
DOI : 10.1007/s10845-008-0106-4

URL : https://hal.archives-ouvertes.fr/hal-01212613

F. Ounnar and P. Pujo, Pull control for job shop: holonic manufacturing system approach using multicriteria decision-making, Journal of Intelligent Manufacturing, vol.24, issue.1, 2009.
DOI : 10.1007/s10845-009-0288-4

URL : https://hal.archives-ouvertes.fr/hal-01212608

P. Pujo, M. Pedetti, and F. Ounnar, Pilotage proactif des lignes de production kanban par modélisation DEVS et simulation temps réel, 5° Conférence Francophone de MOdélisation et SIMulation, pp.1-3, 2004.

P. Pujo, M. Pedetti, and N. Giambiasi, Formal DEVS modelling and simulation of a flow-shop relocation method without interrupting the production, Simulation Modelling Practice and Theory, vol.14, issue.7, pp.817-842, 2006.
DOI : 10.1016/j.simpat.2006.01.001

URL : https://hal.archives-ouvertes.fr/hal-01212617

P. Pujo, F. Ounnar, and P. Blanc, Pilotage des syst??mes manufacturiers via une analyse multicrit??re int??grant produit, ressource et ordre. Application au pilotage en flux tir?? d'un Job Shop, Journal Europ??en des Syst??mes Automatis??s, vol.43, issue.4-5, 2009.
DOI : 10.3166/jesa.43.435-462

V. Ramamurthi, M. E. Kuhl, and K. D. Hirschman, Analysis of Production Control Methods for Semiconductor Research and Development Fabs Using Simulation, Proceedings of the Winter Simulation Conference, 2005., pp.2177-2185, 2005.
DOI : 10.1109/WSC.2005.1574504

V. Ricciardi, P. Pujo, and C. Frydman, DEVS modelling for the proactive control by simulation of kanban production lines, Italy, pp.2-4, 2003.

O. Rose, General simulation applications in semiconductor manufacturing: why do simple wafer fab models fail in certain scenarios?, 32° Winter Simulation Conference, pp.1481-1490, 2000.

H. S. Song and T. G. Kim, The DEVS framework for discrete event systems control, 5th Conference on AI, Simulation and Planning in High Autonomous Systems, pp.228-234, 1994.

W. Management-coalition, &. Terminology, and . Glossary, WfMC-TC-1011, 3.0, Feb 1999, Workflow Management Coalition, Workflow Process Definition Interface ? XML Process Definition Language (XPDL). WFMC-TC-1025, 2005.

G. Zacharewicz, N. Giambiasi, C. Frydman, and . Environment, Lookahead Computation in, Simulation News Europe Journal (SNE), vol.16, issue.2, pp.15-24, 2006.
URL : https://hal.archives-ouvertes.fr/hal-00173580

G. Zacharewicz, C. Frydman, and N. Giambiasi, G-DEVS/HLA Environment for Distributed Simulations of Workflows " Transaction of the SCS Simulation, pp.197-213, 2008.

G. Zacharewicz, D. Chen, and B. Vallespir, Short-Lived Ontology Approach for Agent/HLA Federated Enterprise Interoperability, 2009 International Conference on Interoperability for Enterprise Software and Applications China, pp.329-335, 2009.
DOI : 10.1109/I-ESA.2009.27

URL : https://hal.archives-ouvertes.fr/hal-00369289

B. P. Zeigler, Theory of Modelling and Simulation, IEEE Transactions on Systems, Man, and Cybernetics, vol.9, issue.1, 1976.
DOI : 10.1109/TSMC.1979.4310082

B. P. Zeigler, H. Praehofer, and T. G. Kim, Theory of Modeling and Simulation, 2000.