J. [. Alfares and . Bailey, Integrated project task and manpower scheduling, IIE Transactions, vol.8, issue.9, pp.711-717, 1997.
DOI : 10.1080/07408178808966185

J. Bailey, H. Alfares, and W. Lin, Optimization and heuristic models to integrate project task and manpower scheduling, Computers & Industrial Engineering, vol.29, issue.1-4, pp.473-476, 1995.
DOI : 10.1016/0360-8352(95)00119-L

E. [. Beldiceanu and . Contejean, Introducing global constraints in CHIP, Mathematical and Computer Modelling, vol.20, issue.12, pp.97-123, 1994.
DOI : 10.1016/0895-7177(94)90127-9

URL : https://hal.archives-ouvertes.fr/hal-00442810

J. Blazewicz, W. Domschke, and E. Pesch, The job shop scheduling problem: Conventional and new solution techniques, European Journal of Operational Research, vol.93, issue.1, pp.1-33, 1996.
DOI : 10.1016/0377-2217(95)00362-2

L. Bodin, B. Golden, A. Assad, and M. Ball, Routing and scheduling of vehicles and crews the state of the art, Computers and Operations Research, vol.10, issue.2, pp.63-211, 1983.

. Ph, C. L. Baptiste, and . Pape, Disjunctive constraints for manufacturing scheduling: Principles and extensions, International Journal of Computer Integrated Manufacturing, vol.9, issue.4, pp.306-310, 1996.

[. Cordeau, G. Stojkovi´cstojkovi´c, F. Soumis, and J. Desrosiers, Benders Decomposition for Simultaneous Aircraft Routing and Crew Scheduling, Transportation Science, vol.35, issue.4, pp.375-388, 2001.
DOI : 10.1287/trsc.35.4.375.10432

[. Drezet and J. Billaut, PREDICTIVE AND PROACTIVE APPROACHES FOR RCPSP WITH LABOUR CONSTRAINTS, 12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM06), Saint-Etienne, 2006.
DOI : 10.3182/20060517-3-FR-2903.00076

URL : https://hal.archives-ouvertes.fr/hal-01025516

. Ddi-+-98-]-g, J. Desaulniers, I. Desrosiers, M. M. Ioachim, F. Solomon et al., A unified framework for deterministic time constrained vehicle routing and crew scheduling problems, Fleet management and logistics, pp.57-93, 1998.

R. L. Daniels, B. J. Hoopes, and J. B. Mazolla, Scheduling Parallel Manufacturing Cells with Resource Flexibility, Management Science, vol.42, issue.9, pp.1260-1276, 1996.
DOI : 10.1287/mnsc.42.9.1260

J. [. Daniels and . Mazolla, Flow Shop Scheduling with Resource Flexibility, Operations Research, vol.42, issue.3, pp.504-522, 1994.
DOI : 10.1287/opre.42.3.504

R. L. Daniels, J. B. Mazolla, and D. Shi, Flow Shop Scheduling with Partial Resource Flexibility, Management Science, vol.50, issue.5, pp.658-669, 2004.
DOI : 10.1287/mnsc.1040.0209

S. Demassey, G. Pesant, and L. Rousseau, Constraint Programming Based Column Generation for Employee Timetabling, 7th International Conference on Integration of AI and OR techniques in Constraint Programming for Combinatorial Optimization Problems (CPAIOR'05), 2005.
DOI : 10.1007/11493853_12

URL : https://hal.archives-ouvertes.fr/hal-00293565

A. T. Ernst, H. Jiang, M. Krishnamoorthy, and D. Sier, Staff scheduling and rostering: A review of applications, methods and models, European Journal of Operational Research, vol.153, issue.1, pp.3-27, 2004.
DOI : 10.1016/S0377-2217(03)00095-X

P. [. Erschler, C. Lopez, and . Thuriot, Scheduling under time and resource constraints, Proc. of Workshop on Manufacturing Scheduling, 11th IJCAI, 1989.

R. Freling, D. Huisman, and A. Wagelmanss, Models and algorithms for integration of vehicle and crew scheduling, Journal of Scheduling, vol.6, issue.1, pp.63-85, 2003.
DOI : 10.1023/A:1022287504028

F. Focacci, A. Lodi, and M. Milano, Cost-Based Domain Filtering, Fifth International Conference on the Principles and Practice of Constraint Programming CP'99, pp.189-203, 1999.
DOI : 10.1007/978-3-540-48085-3_14

F. Focacci, P. Laborie, and W. Nuijten, Solving scheduling problems with setup times and alternative resources, AIPS, pp.92-111, 2000.

P. [. Ha¨?tha¨?t, N. Baptiste, G. Brauner, and . Finke, Approches intégréesintégréesà court terme, 2005.

C. [. Haase and . Friberg, An exact algorithm for the vehicle and crew scheduling problem, Computer-Aided Transit Scheduling, pp.63-80, 1999.

]. J. Hoo05 and . Hooker, A hybrid method for planning and scheduling, Constraints, vol.10, pp.385-401, 2005.

D. Klabjan, E. L. Johnson, and G. L. Nemhauser, Airline Crew Scheduling with Time Windows and Plane-Count Constraints, Transportation Science, vol.36, issue.3, pp.337-348, 2002.
DOI : 10.1287/trsc.36.3.337.7831

A. Mercier, J. Cordeau, and F. Soumis, A computational study of Benders decomposition for the integrated aircraft routing and crew scheduling problem, Computers & Operations Research, vol.32, issue.6, pp.1451-1476, 2005.
DOI : 10.1016/j.cor.2003.11.013

]. G. Pes04 and . Pesant, A regular language membership constraint for finite sequences of variables, Tenth International Conference on Principles and Practice of Constraint Programming -CP'04, pp.482-495, 2004.

]. [-rég96 and . Régin, Generalized arc consistency for global cardinality constraint, AAAI/IAAI, pp.209-215, 1996.

G. [. Thorsteinsson and . Ottoson, Linear relaxations and reduced-cost based propagation of continuous variable subscripts, Annals of Operations Research, vol.115, issue.1/4, pp.15-29, 2002.
DOI : 10.1023/A:1021136801775

W. Van-hoeve, G. Pesant, L. Rousseau, and A. Sabharwal, Revisiting the Sequence Constraint, CP-06. Proceedings of the 12th International Conference on Principles and Practice of Constraint Programming, 2006.
DOI : 10.1007/11889205_44