Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies. - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue International Journal of Manufacturing Research Année : 2011

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies.

Résumé

Usually, scheduling of maintenance operations and production sequencing are dealt with separately in the literature and, therefore, also in the industry. Given that maintenance affects available production time and elapsed production time affects the probability of machine failure, this interdependency seems to be overlooked in the literature. This paper presents a comparative study on joint production and preventive maintenance scheduling strategies regarding flowshop problems. The sequential strategy which consists of two steps: first scheduling the production jobs then inserting maintenance operations, taking the production schedule as a strong constraint. The integrated one which consists of simultaneously scheduling both maintenance and production activities based on a common representation of these two activities. For each strategy, a constructive heuristic and two meta-heuristics are proposed: NEH heuristic, Genetic algorithm and Taboo search. The goal is to optimize an objective function which takes into account both production and maintenance criteria. The proposed heuristics have been applied to non-standard test problems which represent joint production and maintenance benchmark flowshop scheduling problems taken from Benbouzid et al. (2003). A comparison of the solutions yielded by the heuristics developed in this paper with the heuristic solutions given by Taillard (1993) is undertaken with respect to the minimization of performance loss after maintenance insertion. The comparison shows that the proposed integrated GAs are clearly superior to all the analyzed algorithms.
Fichier principal
Vignette du fichier
FatimaBenbouzidSitayeb_Maintext_IJMR.pdf (403.27 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-00720671 , version 1 (25-07-2012)

Identifiants

Citer

Fatima Benbouzid-Sitayeb, Christophe Varnier, Noureddine Zerhouni, Sid Ali Guebli, Yassine Bessadi. Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies.. International Journal of Manufacturing Research, 2011, 6 (1), pp.30-48. ⟨10.1504/IJMR.2011.037912⟩. ⟨hal-00720671⟩
112 Consultations
418 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More