Stability evaluation of a railway timetable at station level - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue European Journal of Operational Research Année : 2009

Stability evaluation of a railway timetable at station level

Xavier Delorme
Xavier Gandibleux
  • Fonction : Auteur
  • PersonId : 866414

Résumé

This research deals with a real-world planning problem in railway infrastructure operations. It is part of the RECIFE project, which seeks to develop a decision support software to help evaluate the capacity of a rail junction or station. To this end, the project is working on a timetable optimization model, as well as timetable evaluation modules. This paper presents a module for evaluating timetable stability, which uses an original method based on delay propagation and using shortest path problem resolution. A didactic example and a complete case study applying this method to the Pierrefitte-Gonesse junction are also presented.
Fichier principal
Vignette du fichier
EJOR07_JRodriguez_2009_p.pdf (763.5 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-00506352 , version 1 (27-07-2010)

Identifiants

Citer

Xavier Delorme, Xavier Gandibleux, J. Rodriguez. Stability evaluation of a railway timetable at station level. European Journal of Operational Research, 2009, 195 (3), pp.780-790. ⟨10.1016/j.ejor.2007.06.062⟩. ⟨hal-00506352⟩
165 Consultations
553 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More