| HAL : hal-00462415, version 1 |
| Fiche détaillée | Récupérer au format |
|
|
| 12th International Workshop devoted to Project Management and Scheduling (PMS 2010), Tours : France (2010) |
|
|
|
|
| Discrepancy search for solving flexible scheduling problems |
|
|
| Abir Ben Hmida 1, 2Mohamed Haouari 3 |
|
|
| (03/05/2010) |
|
|
| In this paper, we propose specific adaptations of the Climbing Depth-bounded Discrepancy Search (CDDS) method. We introduce the principles of CDDS and some adaptation for the problems under study. We then present CDDS performance through different well-known benchmarks. |
|
|
|
|
|
|
|
|
|
|
| 1 : | Laboratoire d'analyse et d'architecture des systèmes (LAAS) |
| CNRS : UPR8001 – Université Paul Sabatier - Toulouse III – Institut National Polytechnique de Toulouse - INPT – Institut National des Sciences Appliquées de Toulouse | |
| 2 : | Unité Recherche Opérationnelle pour l'Industrie (ROI) |
| Ecole Polytechnique de Tunisie | |
| 3 : | Department of Industrial Engineering, Faculty of Engineering, |
| Ozyegin University, Istanbul, Turkey | |
|
|
|
|
|
|
|
|
| MOGISA |
|
|
|
|
| Domaine | : | Informatique/Recherche opérationnelle |
|
|
| Liste des fichiers attachés à ce document : | |||||
|
|
|
| hal-00462415, version 1 | |
| http://hal.archives-ouvertes.fr/hal-00462415 | |
| oai:hal.archives-ouvertes.fr:hal-00462415 | |
| Contributeur : Pierre Lopez | |
| Soumis le : Mardi 9 Mars 2010, 16:01:46 | |
| Dernière modification le : Vendredi 7 Mai 2010, 15:12:04 | |