Proposition of New Genetic Operator for Solving Joint Production and Maintenance Scheduling : Application to the Flow Shop Problem. - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2006

Proposition of New Genetic Operator for Solving Joint Production and Maintenance Scheduling : Application to the Flow Shop Problem.

Résumé

Genetic algorithms are used in scheduling leading to efficient heuristic methods for large sized problems. The efficiency of a GA based heuristic is closely related to the quality of the used GA scheme and the GA operators: mutation, selection and crossover. In this paper, we propose a Joint Genetic Algorithm (JGA), for joint production and maintenance scheduling problem in permutation flowshop, in which different genetic joint operators are used. We also proposed a joint structure to represent an individual in with two fields: the first one for production data and the second one for maintenance data. We used different Taillard benchmarks to compare the performances of JGA with each proposed operator.
Fichier principal
Vignette du fichier
Benbouzid2006icsssm.pdf (208.04 Ko) Télécharger le fichier
Origine : Fichiers éditeurs autorisés sur une archive ouverte
Loading...

Dates et versions

hal-00334160 , version 1 (24-10-2008)

Identifiants

Citer

Fatima Benbouzid-Sitayeb, Christophe Varnier, Nourredine Zerhouni. Proposition of New Genetic Operator for Solving Joint Production and Maintenance Scheduling : Application to the Flow Shop Problem.. IEEE International Conference Service System and Service Management, ICSSSM'06., Oct 2006, Troyes, France. pp.607-613, ⟨10.1109/ICSSSM.2006.320531⟩. ⟨hal-00334160⟩
96 Consultations
195 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More